Extensión de la línea Thomson-Costa Este del MRT de Singapur

Extensión de la línea Thomson-Costa Este del MRT de Singapur

The Thomson-East Coast Line is a future MRT line in Singapore that will connect the Thomson Line with the Eastern Region Line. The 43-km link will add 31 new stations to the existing rail network, with seven interchange stations.

For that project, Dextra supplied numerous packages, including Marine Terrace Station, where four large-diameter ojos suaves were installed in the diaphragm wall cages in August 2017.

Soft-Eyes are made of GFRP rebar, which is used to replace the steel reinforcement in the D-Walls of construction shafts. When the Tunnel Boring Machine (TBM) breaks through the D-Walls, it easily cuts the GFRP bars, saving time in the project schedule and reducing equipment costs.

Dextra pioneered this application in the Bangkok metro project in 1998 and has extensive experience in the in-house design and manufacturing of Soft-Eyes.

The D-Walls installed at Marine Terrace Station also feature Bartec® rebar couplers, a common solution for reconnecting slabs horizontally in underground stations. Bartec couplers are also widely used for vertical connections in foundation piles and slabs.



Aeropuerto Internacional de Chennai

Aeropuerto Internacional de Chennai

Chennai International Airport is the main airport serving the southern city of Chennai in India. Located to the south of the city, it is the fourth busiest airport in India.

Dextra was involved in the construction efforts surrounding the airport’s renovation, which took place between 2008 and 2012.

For Chennai Airport, Dextra delivered its popular bartec rebar coupler solution, which is the primary rebar coupler used in large projects across India.

The main contractor for this project was Herve Pomerleau International (HPI) – Consolidated Construction Consortium Limited. The contractor chose the Bartec solution to splice Refuerzo in all columns and muelles (vertical connections) as well as for beams and foundation mats.

Thanks to its parallel thread technology and rebar prepared with various thread lengths, Bartec offers a very high level of performance. It requires only one coupler for both standard applications (when one bar can be rotated inside the coupler) and Aplicaciones de posición (when no bar can be rotated).

Línea 6 del MRT de Dhaka

Línea 6 del MRT de Dhaka

Dhaka Metro Rail is a mass rapid transit system under construction in Dhaka, the capital and busiest city of Bangladesh.

MRT Line 6 consists of 16 elevated stations, each 180 meters long, and 20.1 kilometers of electrified light rail tracks. Except for the depot and some sections of the LRT (Light Rapid Transit) that will run beside it, Line 6 will be elevated over current roadways, largely above road medians, to allow traffic to flow beneath it, with stations likewise elevated.

Dextra supplied various solutions to the project:

  • 50,000 linear meters of Sonitec, an easy-to-assemble and time-saving tube solution used for CSL (crosshole sonic logging) testing of foundation piles.
  • 1,000 Shear Key systems, a post-tensioning bar system that acts as a permanent seismic restrainer for the connection of elevated metro precast segments.
  • More than 50,000 Bartec couplers were also used for the reinforcement of the station structures.

Line 6 construction was anticipated to be completed in 2022.

 

Enlace al aeropuerto de Brisbane

Enlace al aeropuerto de Brisbane

The Brisbane Airport Link is a motorway connecting Brisbane’s business district to the northeast of the city, towards the airport. The construction of the line has been done in segments, with parts of the route already operational. Full completion is planned for 2024.

Dextra has been involved in the design, engineering, and supply of large FRP Ojos suaves for Tunnel Boring Machine (TBM) entry/exit points between 2009 and 2011.

Before the construction of the D-Wall, Dextra engineers designed the FRP cage, considering factors such as the size of the TBM, margin for error, soil forces, and other design parameters.

Thanks to the properties of FRP material, Tunnel Boring Machines can cut through the D-Wall in minimal time, saving schedule time and ensuring the TBM’s head remains in perfect condition.

For this project, Dextra also supplied Griptec couplers, which were used as vertical connections in the D-Walls, barrette piles, and tunnel superstructures. More than 80,000 Griptec couplers have been supplied for the tunnels of the Brisbane Airport Link.

Centro de entrenamiento de la policía de Al Haffar Abu Dhabi

Centro de entrenamiento de la policía de Al Haffar Abu Dhabi

The Al Haffar Abu Dhabi Training Facility is a project by the Abu Dhabi Ministry of Interior. Dextra has been involved in the construction of the tribune facing a police shooting training area. The project is led by the contractor Express Facility Management.

For the construction of the seating area, Dextra supplied its Groutec precast connection solution to the local precaster, Techno Cast Precast, to anchor the footing of large precast “L-shaped” cantilever elements, which will ultimately span over the tribunes.

At the bottom of each pile, 18 Groutec sleeves were installed, fitting onto Ø32mm rebar (bartec threaded rebar is widely available in the UAE through Dextra’s network of distributors).

Precast connection with Groutec

Para más información sobre Dextra soluciones prefabricadas disponible en los Emiratos Árabes Unidos, póngase en contacto con nuestro Oficina de Dubái.

Línea 1 del metro HCMC: Estación del astillero Ba Son

Línea 1 del metro HCMC: Estación del astillero Ba Son

El metro de Ciudad Ho Chi Minh es el primer sistema de tránsito rápido de Vietnam y da servicio a la capital económica y financiera del país.

El sistema de metro contará con ocho líneas. Las líneas 1, 2 y 5 se encuentran en fase de implementación, mientras que las restantes se encuentran en fase de planificación de inversión.

La Línea 1 del proyecto tiene una longitud de 19,7 kilómetros, con un tramo subterráneo de 2,5 kilómetros y un tramo elevado de 17,2 kilómetros. La Línea 1 se extenderá desde el Mercado Ben Thanh, en la zona central, hasta el parque de atracciones Suoi Tien, en el Distrito 9. Hay tres estaciones subterráneas dentro del tramo. La Línea 1 también cruza el río Saigón.

El paquete 1b de la Línea 1 comprende la construcción del tramo subterráneo desde la estación Opera House hasta la estación Ba Son, incluidas dos estaciones subterráneas y un túnel subterráneo de 1.315 metros.

La Operación Conjunta Shimizu-Maeda seleccionó las soluciones de refuerzo de hormigón de Dextra para reducir la congestión de acero en zonas con alto contenido de refuerzo. Se entregaron e instalaron un total de 230.000 barras con cabeza para el refuerzo de los enlaces de corte.

Mae Fah Luang Chiang Rai Airport – Renovation & Expansion

Mae Fah Luang Chiang Rai Airport – Renovation & Expansion

Mae Fah Luang Chiang Rai Airport, located in Chiang Rai, Thailand, is a vital transportation hub for the region. Serving as a gateway to popular tourist destinations like Chiang Mai, Chiang Rai, and the Golden Triangle, the airport has recently undergone a significant renovation and expansion project aimed at modernizing its facilities and increasing its capacity. As part of this project, Dextra supplied over 180 tons of Clavija bars for use as construction juntas in the airport’s runway pavement.

The construction of a runway pavement requires careful planning and preparation. One essential component of the runway pavement is the construction joint, which connects individual concrete slabs. These juntas are necessary to ensure that the pavement can withstand the heavy loads of aircraft and endure extreme weather conditions. Without proper construction juntas, the pavement may experience cracking, spalling, and other types of damage.

Clavija bars are a critical component of construction juntas, as they facilitate load transfer between individual concrete slabs. Typically made of steel, Clavija bars are placed perpendicular to the construction joint, allowing for movement between the concrete slabs while providing support and enabling efficient load transfer.

For the Mae Fah Luang Chiang Rai Airport project, Dextra supplied over 35,000 Clavija bars, totaling more than 180 tons of steel. The Clavija bars were manufactured at Dextra’s facility in Thailand and delivered to the construction site in stages to meet the project’s timeline.

The successful completion of this project has not only increased the airport’s capacity but also improved its safety and reliability, providing a more efficient transportation hub for the region.

Modernización de la refinería de Visakh

Modernización de la refinería de Visakh

El Proyecto de Modernización de la Refinería de Visakh es una expansión industrial de la refinería de Visakh ubicada en Visakhapatnam, India.

El proyecto ampliará la capacidad de refinación de 8,3 MMTPA (millones de toneladas métricas por año) a 15 MMTPA, al tiempo que permitirá la producción y distribución de combustibles que cumplan con Bharat Stage-VI, una nueva norma de emisiones instituida por el Gobierno de la India.

Dextra participó en la ampliación suministrando acopladores atornillados Unitec para uniones de vigas prefabricadas.

Unitec es un sistema de empalme atornillado diseñado para la conexión de dos barras sin rosca: sus tornillos bloquearán ambos extremos de la barra y completarán la conexión.

Está previsto que el proyecto de modernización de la refinería de Visakh finalice en 2020.

Desmantelamiento de Sellafield

Desmantelamiento de Sellafield

Sellafield es una central nuclear actualmente desmantelada, especializada en el reprocesamiento de combustible y el desmantelamiento de otros reactores del Reino Unido e internacionales. Está ubicada en Cumbria, en el noroeste de Inglaterra.

Dextra participó en el suministro de soluciones de conexión de barras de refuerzo para la construcción de nuevos edificios en 2008 a través de su socio fabricante de barras de refuerzo local en el Reino Unido.

Griptec fue la solución de empalme de varillas de refuerzo preferida, ya que está certificada para TA1-A, TA1-B y TA1-C (nivel de certificación "Sellafield"), los tres niveles principales de certificaciones de empalme de varillas de refuerzo de CUIDADOS.

Griptec presenta un nivel de rendimiento inigualable y un proceso de prueba automático que prueba sistemáticamente todas las conexiones producidas como parte de su ciclo estándar: una garantía de que 100% de las conexiones funcionan por encima de los requisitos del proyecto.

Más de 80.000 Griptec En el proyecto se han utilizado conexiones principalmente para aplicaciones de pared.

Planta de reprocesamiento de residuos nucleares de La Hague: el almacenamiento provisional

Planta de reprocesamiento de residuos nucleares de La Hague: el almacenamiento provisional

La planta de La Hague es una instalación de reprocesamiento de combustible nuclear ubicada en La Hague, al norte de Francia. La planta ha tratado residuos nucleares gastados procedentes de varios países desde la década de 1960.

Actualmente operada por AREVA NC, la instalación maneja ahora casi la mitad de la capacidad de reciclaje y reprocesamiento de combustible nuclear gastado del mundo, incluidos los desechos de la propia Francia, así como de Japón, Alemania, Bélgica, Suiza, Italia, Australia, España y los Países Bajos.

La planta de reprocesamiento también separa los residuos según su actividad radiactiva y vida útil, aplicando soluciones de almacenamiento específicas para cada tipo. Para reforzar los dos edificios de almacenamiento de residuos nucleares recientemente construidos en la planta, el contratista principal, VINCI – Travaux Publics Cherburgo, optó por Sistema de empalme a prueba de 100% de Dextra, Griptec, suministrado a través de sus fabricantes locales en Francia.

 

Griptec, acopladores de barras de refuerzo de alto rendimiento para proyectos nucleares en todo el mundo

Para la construcción de proyectos nucleares, se requieren soluciones de refuerzo de alto rendimiento. Por eso... dextra Griptec fue la opción preferida para este proyecto, ya que también es Certificado por AFCEN, cumpliendo con los estándares internacionales para plantas nucleares. Más de 5.000 toneladas de Dextra Sistemas Griptec Se entregaron en el lugar para la construcción de dos edificios de almacenamiento, ambos destinados a almacenar uranio y plutonio.

Griptec Los acopladores se utilizan para reforzar la paredes de los edificios de almacenamiento, tal como ofrecen rendimiento completo En tensión, compresión, carga cíclica y resistencia a la fatiga. Esta solución no deja margen de error, ya que cada conexión se analiza sistemáticamente. Probado mediante una prueba de tracción no destructiva durante el ciclo de extrusión como parte de su proceso estándar, garantizando un rendimiento por encima de los requisitos del proyecto.

Además, para nuestros clientes en el industria nuclearDextra ofrece más que solo soluciones de refuerzo: también apoyamos diseñadores, consultores y contratistas a lo largo de cada etapa de sus proyectos de construcción.