Grupo Dextra | Conexiones confiables

DEXTRA
Buscar
Cierra este cuadro de búsqueda.
mi dextra
Buscar
Cierra este cuadro de búsqueda.

National Bank of Kuwait – New Headquarter

National Bank of Kuwait – New Headquarter

The new headquarters building of the National Bank of Kuwait is a 300m-tall tower that covers a total floor area of 127,000m2 with a design concept inspired by pearl shells and located in the heart of Kuwait City’s financial district.

The main construction comprises composite concrete and steel, while the cladding on the fins and glass façades is predominantly glass-reinforced concrete.

Dextra took part in reinforcing the concrete structure of the building by providing these solutions:

  • 100,000 Bartec couplers were installed for columns reinforcement, construction joints in raft and slab/beam to core wall connections.
  • 35,000 headed bars act as shear studs in raft.
  • 1,500 Unitec bolted couplers were used to extend existing reinforcing bars that were either not threaded or too short for lapping. It is a convenient solution to connect rebars by using a simple pneumatic wrench at the construction site, without the need of any rebar preparation.
  • El condominio Plum | พลัมคอนโด

    El condominio Plum | พลัมคอนโด

    La estación Plum Central es un proyecto de condominio de 38 pisos, formado por 2 torres y ubicado cerca de la estación elevada de metro Bang Yai, en el noroeste de Bangkok. El edificio residencial albergará 1.013 apartamentos.

    La Fase 1 del proyecto (primera torre) comenzó en septiembre de 2015 y se completará alrededor de marzo de 2018. La construcción a un ritmo rápido es posible gracias al uso de técnicas de hormigón "totalmente prefabricadas".

    Para este proyecto, el propietario del proyecto, Pruksa, gestiona su propia planta de elementos prefabricados.

    Para este proyecto, el objetivo de Pruksa era poder montar rápidamente paneles prefabricados (actuando como muros de corte) para todos los niveles sobre el suelo. Dextra sugirió para ello el uso de acopladores Groutec.

    Acopladores Groutec, montados sobre varilla de Ø25mm previamente preparada con rosca Bartec. Los acopladores, instalados en la parte inferior de cada elemento prefabricado, luego se moldean como parte del elemento del panel de pared prefabricado.

    Después de elevar el elemento al piso superior de la obra, se logra la reconexión con las armaduras salientes mediante la inyección de mortero sin retracción. Cabe señalar que Dextra no proporciona el mortero, que puede obtenerse localmente, lo que genera importantes ahorros. Después de inyectar la lechada, los refuerzos alrededor de cada panel se pueden quitar después de 3 días.

    Para obtener más información sobre la aplicación Plum Central Station y Groutec, consulte nuestro estudio de caso.

     

    Primer acto | Torre del segundo acto

    Primer acto | Torre del segundo acto

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Venta al por menor de cajas grandes

    Venta al por menor de cajas grandes

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    Torre de la Trinidad La Défense

    Torre de la Trinidad La Défense

    La Trinity Tower en el distrito de negocios de La Défense, al oeste de París, es una nueva torre de oficinas de 33 pisos y 140 metros de altura que contará con más de 52.000 metros cuadrados de espacio para oficinas.

    El proyecto tiene como objetivo lograr un impacto local tanto social como ambiental mediante la adición de grandes espacios públicos al aire libre que reconectan áreas previamente desconectadas por la carretera. También contará con espacios verdes, un espacio en la azotea, fachadas abiertas y logrará una certificación LEEDS.

    Para este proyecto, Dextra suministró a través de su distribuidor francés SNAAM Vernon más de 18.000 FORTEC® conexiones de barras de refuerzo.

    Los acopladores de barras de refuerzo permiten acelerar el ritmo de construcción al proporcionar una forma rápida y segura de conectar las barras de refuerzo: una barra a la vez, por paquetes o jaulas. En el caso de paquetes y jaulas, estos se pueden ensamblar fuera del sitio y simplemente volver a conectarse mediante acopladores una vez que lleguen a la ubicación final.

    Está previsto que la Trinity Tower esté terminada en 2019.

    Para obtener más información sobre la disponibilidad de soluciones de empalme de barras de refuerzo en Francia, comuníquese con nuestro Oficina de París para más información.

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    Torre de Jedda

    Torre de Jedda

    Jeddah Tower (anteriormente conocida como Kingdom Tower) es un rascacielos emblemático ubicado a lo largo del Mar Rojo en el norte de Jeddah, Arabia Saudita.

    El edificio comercial está diseñado para superar por primera vez la marca de 1 kilómetro con una altura total esperada de 1.008 metros, lo que lo convierte en el edificio más alto del mundo.

    La Torre Jeddah albergará en última instancia un hotel Four Seasons de 200 habitaciones, apartamentos con servicios, varios pisos de oficinas y un observatorio. Un total de 59 ascensores permitirán a los visitantes desplazarse entre plantas.

    La estructura de la torre ha sido diseñada por la consultora Thornton Tomasetti y construida por el contratista Saudi Bin Laden, al que Dextra realiza entregas gracias al apoyo de su socio local Bahra Steel.

    Dextra se enorgullece de entregar 100% de acopladores de barras de refuerzo en la estructura, tanto en los cimientos como en la superestructura.

    En la estructura se utilizan dos tipos principales de acopladores de barras de refuerzo:

    • Para todos los cimientos, columnas y conexiones verticales, se utilizan acopladores Bartec estándar. Estos permiten una conexión rápida de jaulas prefabricadas.
    • Para las conexiones de losa, también se utilizan acopladores de puente especiales para conectar cada pata de la barra de refuerzo en forma de U a una columna.

    La torre aún está en construcción y se espera que esté terminada alrededor de 2019.

    La torre prefabricada más alta de la India

    La torre prefabricada más alta de la India

    Galaxy Towers, developed by Aurobindo, is a project to construct 24-storey precast office building in Hyderabad, India.

    It will be the tallest office tower in India built with precast technology.

    The building comprises of 4 basement floors and 24 upper stories with 1.9 million sq. ft. leasable area, which will include health clubs, food courts, cafés, a business center, ample car parking and a waiting lounge.

    The project is expected to be built in half the time of a comparable conventional cast-in-situ construction, illustrating how the precast technology has gained ground thanks to its efficiency.

    For this special project, Dextra supplied a critical part of the precast structure: Groutec coupler, a half-grouted sleeve designed for the connection of precast elements and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, AASHTO & IS 16172.

    By installing Groutec couplers into the precast columns and walls at the precast factory, the fast and safe connection of walls or columns is achieved by injecting cementitious non-shrink grout through the inlet into the sleeves at site. 102,000 Groutec couplers have been delivered for this project.

    The Galaxy Towers is anticipated to be completed in 2020.

    (photo credit: Aurobindo Realty & Infrastructure Private Limited at https://bit.ly/37DW7IT)

    ciudad de zajr

    ciudad de zajr

    Zakhr City es uno de los proyectos inmobiliarios más grandes de La Meca, Arabia Saudita. Este proyecto de desarrollo mixto consta de hoteles de tres a cuatro estrellas, torres residenciales, así como mercados, centros de salud, estaciones de policía y bomberos. Está diseñado para albergar a más de 200.000 personas.

    Dado que el sitio de construcción se encuentra en una zona montañosa, un sistema de pernos era fundamental para asegurar la masa de roca suelta creada después de la excavación. Dextra entregó casi 3000 pernos de roca completamente roscados de acero para estabilizar el sitio.

    Los pernos de roca funcionan uniendo los estratos de roca inestables antes de que puedan moverse lo suficiente como para causar fallas. Dextra ofrece pernos de roca de acero y FRP cortables para empernado frontal o cualquier otra aplicación de túneles/minería.

    Dextra ha estado involucrado desde las primeras etapas de este proyecto para brindar productos de alta calidad y soporte profesional en el sitio de construcción.

    Parque Energético Rey Salman (SPARK)

    Parque Energético Rey Salman (SPARK)

    King Salman Energy Park (SPARK) es un nuevo proyecto de ciudad industrial en construcción y ubicado entre Dammam y Al-Ahsa en la Provincia Oriental de Arabia Saudita.

    El proyecto tiene como objetivo responder a la demanda cada vez mayor de productos y servicios relacionados con la energía del país, incluida la exploración, producción, refinación, petroquímicos, energía convencional, producción y tratamiento de agua y perforación.

    Al finalizar la primera fase en 2021, SPARK se dividirá en 5 zonas principales que son zona industrial, puerto seco y zona logística, distrito comercial, centros de capacitación y complejos residenciales, y actividades comerciales.

    Dextra suministró alrededor de 700.000 barras de refuerzo ASTEC GFRP (polímero reforzado con fibra de vidrio), modelo GR45P en forma recta y curvada, para edificios y aceras.

    La barra de refuerzo ASTEC GFRP GR45P proporciona un módulo de elasticidad a 45GPa y resistencia a la tracción según ASTM 7205 – 06. Puede usarse como material de refuerzo para construcciones nuevas y existentes.

    Una vez finalizada la tercera fase, prevista para 2035, ocupará 50 kilómetros cuadrados y se prevé que creará 100.000 puestos de trabajo.

    Por favor ingresa tu información

    Contáctenos

       Comparta su información con nosotros y nos comunicaremos con usted lo antes posible.