Dextra’s Quarterly Newsletter: Connection #22


Melbourne Metro project: a showcase of Dextra solutions

 

The Metro Tunnel is a major enhancement to Melbourne’s rail network, a multibillion-dollar project comprising the design and construction of twin nine-kilometer tunnels and five underground stations.

The stations are designed based on the architectural character of the local area.

Dextra has been selected as a one-stop solution supplier, thanks to its wide range of products.

The numbers are impressive:

  • 400,000 Griptec rebar couplers
  • 5,300 GFRP Combination Bolts
  • 900 GFRP soil nails
  • 16 ojos suaves

Dextra was able to support and share their expertise on GFRP at design stage and produce the GFRP solutions as per the owner expectation.

Pruebas de rendimiento del acoplador a temperaturas elevadas.

 

El Imperial College de Londres probó los acopladores Dextra Bartec/Fortec y Griptec a temperaturas elevadas para evaluar cómo se comportarían en caso de incendio.

Los aspectos más destacados de la prueba incluyen:

  • Los hallazgos indican que las reglas codificadas actuales se pueden utilizar para evaluar las propiedades de resistencia y rigidez tanto de las barras de refuerzo no empalmadas como de las barras de refuerzo conectadas con acopladores Bartec/Fortec o Griptec.
  • A temperaturas inferiores a 400°C, la resistencia máxima a la tracción y la rigidez de los empalmes Bartec/Fortec y Griptec, así como de las barras de refuerzo no empalmadas, no se ven significativamente afectadas.
  • Cuando se realizaron pruebas de tracción a temperaturas inferiores a 500 °C, la falla generalmente aún se produjo en la barra de refuerzo fuera de la región del acoplador Bartec/Fortec o Griptec.

More about our latest projects

w660_11563472_onenineelms
w660_11563471_captaincook
w660_11563473_zakhrcity

One Nine Elms, United Kingdom                              

Griptec and Sonitec solutions were supplied to ensure structural safety and integrity of the iconic towers.

Strengthening of Captain Cook Bridge, Australia

In collaboration with Freyssinet, Freyssibar+ was the best smooth post tensioning bar for the job.

Zakhr City, Arabia Saudita                                                   

3,000 fully threaded steel Rock Bolts were applied to secure the loose rock mass created after excavation.

New Tension Rods design tools!

To facilitate the work of designers and consultants, our team develops and continually improves intuitive tools for AutoCAD, Revit and Tekla users.

The updated Tension Rods systems were added to the Dextra design tool ranges, along with new tutorial videos.

Take advantage of our easy-to-use components, available for free download!

Interview with World Success Solutions

“We have been growing together and become one of the top mechanical splicing system providers in Malaysia, supporting many key customers, both local and international.”

 

 

 

Meet World Success Solutions Sdn Bhd (WSS), an engineering product solutions company in Malaysia that provide one stop service to local customers.

Find out why they have chosen Dextra since their first mega project in Malaysia

Por favor ingresa tu información

Contáctenos

   Comparta su información con nosotros y nos comunicaremos con usted lo antes posible.