Dextra-Gruppe | Zuverlässige Verbindungen

DEXTRA
Suche
Schließen Sie dieses Suchfeld.
Mein Dextra
Suche
Schließen Sie dieses Suchfeld.

Bartec/Fortec Bridging CAD/BIM Tools Available

Bartec/Fortec Bridging Coupler is now available on AutoCAD, Revit, and Tekla for all your construction design and detailing needs!

Ideal for connecting bars that can’t be brought butt-to-butt—perfect for complex prefabricated cages—our Bridging Coupler simplifies rebar connections, helping you streamline your projects.

Start integrating it into your designs today!

📥 Download now:

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 
 

Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying over 60,000 Fortec+ couplers. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.

The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques, and Dextra’s Fortec+ couplers contributed significantly to the project’s structural integrity and long-term performance. The couplers were used to connect rebars in various locations, such as precast panels, tunnel access points, and driveways.

Fortec+ is a system that includes an additional rebar preparation process, in which the threaded bar end is proof tested by applying a tensile load. This is a non-destructive test, as the load level remains within the elastic zone of the reinforcing bar.

 

Image credit: Central Kowloon Route – Highways Department

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential Bartec Und Groutec S systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

 

Bartec, renowned for its mechanical splicing capabilities, and Groutec S, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Bitte geben Sie Ihre Daten ein

Kontaktiere uns

   Teilen Sie uns Ihre Informationen mit und wir werden uns so schnell wie möglich bei Ihnen melden.