Etihad Rail is a 1,200-kilometer railway project that will be the first national freight and passenger railway network in the United Arab Emirates (UAE).
The railway project is expected to be a sustainable alternative for freight and passenger transportation throughout the Emirate’s urban and rural areas.
It is expected to carry approximately 16 million passengers and 50 million tons of cargo.
Dextra is currently supplying various engineered solutions for the second phase of rail network construction which includes excavation of the GCC’s longest rail tunnel.
- Bartec couplers for concrete structure reinforcement.
- Sonitec tubes for the crosshole sonic logging testing of foundation piles.
- Steel and GFRP rock-bolts for rock stabilization.
Umbrella pipes for stabilizing tunnel headings.
Introducing our newest brand
in the composite glass fiber (GFRP) rebars market:
Stronger and lighter than steel, with 6x to 8x times less material needed than conventional steel rebars.
Material is safe and easy to handle, requiring much less labor for installation, generating both time & money saving.
Durable material allows for a longer lifetime of the structure with no maintenance nor repair work needed.
Sustainable material, with significantly less energy required and less CO2 emission.
More about our latest projects
Fangchenggang Nuclear Power Plant 3&4, China
Dextra has supplied more than 500,000 sleeves of Griptec coupler for the reinforcement of the APC structure.
Thane-Kalwa Creek Bridge, India
More than 20 sets of Tension Rod system in various lengths were used as suspenders for steel arch bridge.
Brussels Metro Line 3, Belgium
13 km of Sonitec tubes were installed in the 18m long pile cages to facilitate the integrity testing of foundations.
Groutec is now available for Allplan Precast!
Groutec is a mechanical splicing system designed for the connection of precast concrete elements. Three alternative models are available:
- Groutec L, a wide half-grouted sleeve with one threaded end.
- Groutec S, a slim half-grouted sleeve with one threaded end, suitable for compact applications.
- Groutec F, a new fully-grouted sleeve without any threaded end.
These solutions now come with BIM tools for Allplan Precast software, a 2D and 3D CAD software leader in the precast concrete industry, to facilitate the design and detailing of precast building structures by importing the components to the software.
Dextra Rebar coupler systems featured on The Singapore Engineer magazine
Dextra-Bewehrungskupplungssysteme werden in der Juli-Ausgabe 2021 des Magazins The Singapore Engineer vorgestellt.
Der Artikel bietet Hinweise zum Einsatz und den Vorteilen der Systeme für Infrastrukturprojekte in Singapur unter Berücksichtigung der Anforderungen der ISO 15835-Norm.