Dextra-Gruppe | Zuverlässige Verbindungen

Suche
Schließen Sie dieses Suchfeld.

FibreCraft Insights Video: Episode 3.2 Now Launched

Dextra is excited to announce the launch of its new FibreCraft Insights video series, featuring Pierre Hofmann, General Manager of Geotec, alongside Bhargav Jog, Business Development Manager. This series aims to provide valuable insights into Glass Fibre Reinforced Polymer (GFRP) and its applications.

  • In the first episode, “GFRP Demystified,” viewers are introduced to the basics and benefits of GFRP materials. This episode lays a solid foundation for understanding the material’s potential and how it can be utilized in various industries.
  • The second episode, “Unlocking the Technical Marvel,” delves into the key mechanical properties of GFRP. Pierre Hofmann and Bhargav Jog explore the technical aspects that make GFRP a remarkable material for innovative engineering solutions.
  • The third episode, “GFRP in Action“, discusses the applications of GFRP products for tunnelling projects, flatwork applications, and active and passive anchoring.

Stay tuned for more episodes of FibreCraft Insights, which will continue to uncover the advantages and applications of GFRP. You can watch the series on our website, YouTube channel, and LinkedIn.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Sharing Some Mumbai Office Inauguration Glimpses!

We’re thrilled to announce the relocation of our Mumbai office to a new space at:

📍 501, Satellite Silver Co-op Prem Soc Ltd, M V Road, Village Marol, Marol Naka, Andheri-East, Mumbai – 400059
📞 Tel: +91 022 4503 5611

Our team is excited to keep delivering exceptional service and driving innovation from this new hub. We are deeply grateful for the opportunities and support that have brought us to this milestone.

Our commitment to excellence remains unwavering, and we look forward to serving you better from our new address!

Dextra’s Quarterly Newsletter: Connection #38

The Mumbai Metro Line 2B is a vital infrastructure project designed to enhance public transport in Mumbai. Dextra has contributed to the project by supplying advanced construction solutions to ensure the structure’s durability and strength.

For the elevated section’s U-girders, Dextra provided CR-Stange 1080 for both stressing and pre-tensioning. Additionally, fully threaded bars were supplied for temporary stressing, offering flexible and secure connections between precast segments.

Dextra also delivered Unitec couplers, enabling efficient rebar connections without pre-threading, ensuring strong, seamless structural continuity on-site. Moreover, Sonitec CSL testing tubes were provided for concrete pile integrity testing.

By contributing these advanced materials and solutions, Dextra is supporting the development of a reliable metro system that will meet Mumbai’s growing transportation needs for years to come.

More about our latest projects

UK_HS2-ChilternTunnel_Slider3
DE_A66-Salzbachtal-Bridge_Slider5
TH_Neo-Factory_Slider2

High Speed 2 (HS2), UK

Griptec couplers are reinforcing critical rebar connections across multiple key sites in the UK’s new high-speed railway project.

Cairo Monorail Bridge, Egypt

High-strength tension rods were used as hangers for the bowstring monorail bridge to maintain its structural integrity and durability.

Salzbachtal Bridge, Germany

Sonitec CSL tubes were chosen for cross-hole sonic logging to assess deep foundation integrity and ensure the stability of the bridge.

Neo Factory Phase 1, Thailand

Bartec Und Groutec play a key role in the precast column connections, guaranteeing reliable construction.

Introducing Durabar Carpet: the latest breakthrough from Dextra!

Made from Durabar GFRP rebar, this latest patented Durabar Carpet offers unparalleled versatility for construction projects. Designed for efficiency, its ability to be cut effortlessly in any direction ensures maximum material savings.

Key Features:

•   Bar from Ø 6mm to Ø 16mm
•   Standard length: 5.8m
•   Customizable lengths: 2m to 5.8m
•   Flexible spacing: 100mm to 600mm

Watch Now: FibreCraft Insights – Exploring GFRP in Construction

Dextra is excited to present FibreCraft Insights, our brand-new video series dedicated to Glass Fibre Reinforced Polymer (GFRP) rebar in the infrastructure construction industry.

Hosted by our experts in composite solutions, this series offers valuable insights into the growing role of GFRP in modern construction.

The first three episodes are available now, where we delve into an introduction to the material and its advantages, the unique technical features of GFRP, and real-world applications.

Follow our LinkedIn to stay tuned for more episodes!

Recent activities

Our Collaboration with Makin Juta

Watch our latest interview with Makin Juta, one of our esteemed distributors and partners in Malaysia, and discover our collaboration on the iconic KLCC Lot L and M Podium project, where Bartec was selected as the trusted solution. Watch the interview

 

Tension Rods & PT Bars EPD Verified

Dextra’s tension rods and post-tensioning bars are Environmental Product Declaration (EPD) verified and listed on the EPD Hub, joining our previously verified couplers, GFRP rebars, marine tie bars, ground anchors, rock bolts, and Sonitec. Mehr lesen

 
 

 

Headed Bars Now CE Marked with ETA

Bartec, Fortec, and Rolltec headed bars are now CE marked with European Technical Assessments (ETA). Tested by Concrefy and certified by Kiwa, these are our first CE-marked products, meeting the essential requirements. Mehr lesen

 

Commitment to Community in Thailand

Dextra Thailand donated to the Cerebral Palsy Sports Association of Thailand. Mehr lesen. Additionally, we donated unwanted office furniture to a school and hosted environmental stewardship activities for students. Mehr lesen

 

Upcoming events

World of Concrete India

16-18 Oct 2024

Port Dev. MEA Forum, United Arab Emirates

21-22 Oct 2024

ASEAN Ports & Logistics, Malaysia

10-11 Sep 2024

Bauma
China

26-29 Nov 2024

CTBUH Asia Conference, Thailand

3-4 Dec 2024

Dextra Celebrates Paralympic Success with Thai Boccia Athletes

Dextra had the pleasure of visiting the Cerebral Palsy Sports Association of Thailand (CPSAT) once again, following our initial visit in June. During that visit, we donated funds to support these dedicated athletes in their training and competitions, and we even had the opportunity to play a friendly boccia match together. Since then, these remarkable athletes have achieved outstanding success at the recent Paralympic Games in France, winning a gold medal and two bronze medals in Individual Boccia.

This return visit allowed us to personally congratulate the athletes on their incredible accomplishments. Their perseverance and commitment have not only brought pride to Thailand but also inspired us all at Dextra. We are honored to have supported them on their journey and are excited to continue backing their future endeavors.

Through these ongoing efforts, Dextra reaffirms our dedication to giving back to the community and celebrating the triumphs of individuals who embody the spirit of resilience and determination.

Bartec, Fortec, Rolltec Headed Bars Achieve CE Marking

Dextra’s Bartec, Fortec, and Rolltec Headed Bars Achieve CE Marking—A Milestone in Engineering Excellence

Dextra is proud to announce a significant milestone in our journey of delivering high-quality construction solutions: our Bartec, Fortec, and Rolltec large headed bars, ranging from 16 to 40mm in diameter, have been assessed and granted European Technical Assessments (ETA) and are now officially CE marked. This achievement is based on the stringent regulations under EAD 160012-01-0301, edition April 2021, certified by Kiwa, one of the largest certification bodies in the world.

CE marking signifies our products meet the essential requirements for headed reinforcing steel bar within the European Economic Area. It also reinforces our commitment to providing safe, reliable, and high-performance solutions in the construction industry.

To ensure that our products meet the highest standards, rigorous testing was conducted by Concrefy; the most recognized and experienced laboratory in the Netherlands, in accordance with ISO 15698. These tests verified the mechanical properties, durability, and overall performance of our headed bars, ensuring they comply with stringent European standards.

A First Step Toward a Larger Vision

This achievement marks the beginning of an exciting new chapter for Dextra. These are our first products to receive CE marking, and we are already working on expanding this certification to more of our product range. Our goal is to continue delivering innovative solutions that meet and exceed industry standards globally.

CE marking is not just a badge of compliance; it is a testament to our unwavering dedication to engineering excellence, quality, and customer satisfaction. As we continue to push the boundaries of what is possible in the construction sector, we are committed to setting new benchmarks in product performance and safety.

Stay tuned as we bring more CE-marked innovations to the market, driving the construction industry forward with cutting-edge solutions designed to last.

Über Dextra

Dextra is a leading provider of engineered construction products and solutions, specializing in high-performance rebar coupler systems and other advanced engineered construction technologies. With a global presence and a reputation for quality, Dextra continues to lead the industry in innovation and customer satisfaction.

Bartec-Fortec Headed bars - ETA-24-0219

Bartec-Fortec Headed bars - ETA-24-0219

Die PDF-Datei kann nicht angezeigt werden. Herunterladen stattdessen.

Rolltec Headed bars - ETA-24-0268

Rolltec Headed bars - ETA-24-0268

Die PDF-Datei kann nicht angezeigt werden. Herunterladen stattdessen.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

Der Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of CR-Stange 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Bartec/Fortec Bridging CAD/BIM Tools Available

Bartec/Fortec Bridging Coupler is now available on AutoCAD, Revit, and Tekla for all your construction design and detailing needs!

Ideal for connecting bars that can’t be brought butt-to-butt—perfect for complex prefabricated cages—our Bridging Coupler simplifies rebar connections, helping you streamline your projects.

Start integrating it into your designs today!

📥 Download now:

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 
 

Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying Fortec+ couplers, along with steel rock bolts, expandable friction bolts, umbrella pipes, and post-tensioning bars for tunneling works. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.

The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques. Dextra’s Fortec+ couplers, used in locations such as precast panels, tunnel access points, and driveways, contributed significantly to the project’s structural integrity and long-term performance. The Fortec+ system includes a rebar preparation process in which the threaded bar end is proof tested with a tensile load, ensuring non-destructive testing within the elastic zone of the reinforcing bar.

 

Image credit: Central Kowloon Route – Highways Department

Bitte geben Sie Ihre Daten ein

Kontaktiere uns

   Teilen Sie uns Ihre Informationen mit und wir werden uns so schnell wie möglich bei Ihnen melden.