U-Bahn Lucknow – Phase 1

U-Bahn Lucknow – Phase 1

The Lucknow Metro project is built to serve the growing population of Uttar Pradesh, North India, as well as to serve the areas that are not connected by the existing rail system. The 35km rail system comprises 22 stations, of which 19 will be elevated.

The first phase of the project consists construction of 2 rail lines (North- South and East-West corridor), connecting the four corners of Lucknow by running through the heart of the city. Being implemented by Lucknow Metro Rail Corporation (LMRC), the Phase 1 comprises the construction of 22.8km long North-South corridor.

The priority section is the 8.5 kilometers linking Transport Nagar to Charbagh.
Once operational, the Lucknow Metro will help ease the traffic in the city, and will also reduce commuters’ travel time.

Stadtbahnlinie 3

Stadtbahnlinie 3

The 37km-long Light Rail Transit Line 3 (LRT3) is a light rail line under development in Malaysia. It includes a 35km viaduct and a 2km underground tunnel which will link Bandar Utama with Johan Setia in Klang.

Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will play a strategic part in extending rail connectivity to the Western Corridor of GKL/KV.

Dextra provided cuttable Glass Fiber Reinforced Polymer (GFRP) soft-eye solutions, installed in diaphragm walls of escape shafts, in order to facilitate the underground tunnel breakthrough by the Tunnel Boring Machines (TBM).

The LRT3 project is expected to serve 2-million people across the alignment by improving connectivity, alleviating traffic congestion and stimulating economic growth along the Western Corridor of Klang Valley, from Klang to Petaling Jaya.

The construction is scheduled for completion by February 2024.

Panama Metro Linie 3

Panama Metro Linie 3

Panama Metro Line 3 is a 34km-long monorail line being developed as part of the Panama metro project. It will be the largest project in the country since the expansion of the Panama Canal.

The line will establish a connection between the province of Panama Oeste and the province of Panama, reducing the average travel time by half, from 90 minutes to 45 minutes. The monorail system will be the first to use Japanese technology in the Americas.

Dextra supplied 260,000 Bartec couplers for the elevated monorail structure’s piling column and precast beam connection.

Sonitec tubes were also used to examine the concrete integrity of bore-piles using the crosshole sonic logging testing method.

Expected to begin operations in mid-2025, the line will benefit more than 500,000 residents of the Panama Oeste province.

Image credit: Línea 3 del Metro de Panamá YouTube Channel, www.elmetrodepanama.com

Metro Lima

Metro Lima

The Lima Metro is a rapid transit system in Peru, currently linking Villa El Salvador district in the south of Lima with San Juan de Lurigancho, in the northeast area of the city. The Metro Line 1 started its operation in 2011 with 26 stations, making a total of 34.6 kilometers, the longest metro line in the Americas.

Die Anfänge is proud to contribute to the construction of Metro Line 2 and the initial phase of Line 4, both of which commenced simultaneously in 2016. Line 2, a 27-kilometer fully underground transit route, will seamlessly connect Lima’s Ate district with the Callao region. Meanwhile, the first 8-kilometer segment of Line 4 will serve as a crucial link between Line 2 and the Jorge Chávez International Airport station, enhancing connectivity for commuters and travelers alike.

More than 160,000 Rolltec rebar couplers have been supplied to the Metro construction site to avoid rebar congestion of the traditional overlapping method.

Several types of Rolltec couplers were installed in various parts of the stations’ structures, including standard couplers size #8, #11 and #14, and transition couplers size #8 and #11.

The full line will be operational in 2024.

Etihad Rail

Etihad Rail

Etihad Rail ist ein 1.200 Kilometer langes Eisenbahnprojekt, das das erste nationale Güter- und Personenbahnnetz in den Vereinigten Arabischen Emiraten (VAE) bilden wird, die sieben Emirate verbindet und den Handel und die soziale Entwicklung im Land und in den GCC-Ländern fördert.

Das Eisenbahnprojekt soll eine nachhaltige Alternative für den Güter- und Personentransport in den städtischen und ländlichen Gebieten des Emirats sein. Es wird erwartet, dass etwa 16 Millionen Passagiere und 50 Millionen Tonnen Fracht befördert werden. Es wird einen wesentlichen Beitrag zur Reduzierung der Emissionen im Straßenverkehr leisten.

Das Etihad Rail-Netzwerk reicht im Westen bis an die Grenzen von Katar und Saudi-Arabien. Der westliche Abschnitt ist über Ghweifat mit Saudi-Arabien verbunden, während der östliche Abschnitt über Al Ain mit Oman verbunden ist. Die Eisenbahnlinie verbindet Abu Dhabi, Sharjah und Dubai und verläuft quer durch das Emirat. Anschließend geht es weiter in die nördlichen Emirate und nach Fujairah.

Der Ausbau des Schienennetzes erfolgt in 3 Etappen. Die erste Phase des 2016 eröffneten Eisenbahnnetzes ist eine 266 Kilometer lange westliche Strecke zwischen Al Ruwais und Shah. Es verbindet Ruwais und Habshan und dann Habshan und Shah.

Die zweite Phase verbindet Abu Dhabi mit Dubai. Es ist auch mit den Häfen Jebel Ali, Musaffah und Khalifa verbunden. In der dritten Phase geht es um die Anbindung der nördlichen Emirate. Die Fertigstellung der zweiten und dritten Phase ist für 2024 geplant.

Dextra liefert derzeit verschiedene technische Lösungen für die zweite Phase des Schienennetzbaus, zu der der Bau einer 200 km langen Hauptstrecke in Abu Dhabi und einer 40 km langen Nebenstrecke zum Hafen Khalifa, einer 78 km langen Hauptstrecke in Dubai und einer 20 km langen Nebenstrecke nach Jebel gehört Ali-Hafen, eine 98 km lange Hauptstrecke von Sharjah nach Fujairah und eine 29 km lange Nebenstrecke nach Tawyeen sowie zugehörige Einrichtungen.

Diese Lösungen wurden auf die Baustelle des Eisenbahntunnels geliefert.

Quelle des oberen Bildes: https://filipinotimes.net/news/2019/12/19/coming-soon-rail-network-linking-dubai-fujairah-khorffakan-ports/

Singapore Circle Line (CCL) – Etappe 6

Singapore Circle Line (CCL) – Etappe 6

The Circle Line (CCL) is an underground Mass Rapid Transit (MRT) line in Singapore. The 35km, 30-station line runs from Dhoby Ghaut to Marina Bay in the Central Area to HarbourFront.

Es handelt sich um eine der längsten fahrerlosen Schnellverkehrslinien der Welt.

In 2013, the Circle Line stage 6 was announced, a 4km extension to finally close the circle of the CCL by connecting HarbourFront station to Marina Bay station.

Drei weitere Stationen befinden sich im Bau und werden voraussichtlich im Jahr 2025 in Betrieb gehen.

Well-known expertise and quality in concrete reinforcement solutions were necessary to tackle this project, and Dextra’s Bartec couplers were chosen for several parts of the Circle Line structure, including starter bars, slabs, and column joints.

Bis zum Ende des Projekts werden rund 200.000 Kupplungen vor Ort geliefert.

Darüber hinaus, Die Anfänge provided 3,000m of Glass Fiber Reinforced Polymer (GFRP) rebars, that can boast some key benefits with respect to metal rebars: a lighter weight, no risk of corrosion, and a lower susceptibility to attract lightning strikes.

On top of that, Die Anfänge was entrusted with the reinforcement of the concrete structure of the tunnels: 8 Astec Soft-Eyes were used to facilitate the penetration of the Tunnel Boring Machines (TBM) through diaphragm walls, thanks to their innovative cuttable GFRP structure.

Verlegung der Kläranlage Sha Tin in Kavernen

Verlegung der Kläranlage Sha Tin in Kavernen

The Sha Tin Sewage Treatment Works Relocation project was aimed to relocate the Sha Tin Sewage Treatment Works (STW) in Sha Tin, Hong Kong, which is currently located at the mouth of the Shing Mun River, to the cavern site at Nui Po Shan of A Kung Kok on the opposite bank, freeing up the existing site for uses beneficial to people’s livelihood and improving the local living environment.

The future Sha Tin Cavern STW will be the largest of its kind in Hong Kong, occupying 14 hectares of land. It will have the same treatment capacity as the current site, but will use advanced sewage treatment technology to meet local population demands and improve services for residents.

For the tunneling works, Dextra has supplied around 800 pieces of GEOTEC™ GFRP rock-bolts for the tunnel’s temporary supporting.

GEOTEC™ GFRP rock-bolts are made of cut-able glass fiber reinforced polymers, making them perfect for face bolting or any other tunneling and mining application where further excavation is required.

Source of images: https://ststwincaverns.hk/

Waldstadt Johor 森林城市

Waldstadt Johor 森林城市

Forest City ist eine riesige Stadtentwicklung mit gemischter Nutzung, die an der Südspitze Malaysias, in der Region Iskandar, Johor, stattfindet. Die Entwicklung findet auf neu gewonnenem Land direkt gegenüber der Johor-Straße in Sichtweite von Singapur statt.

Das Projekt, das im nächsten Jahrzehnt fortgesetzt wird, zielt letztendlich darauf ab, 300.000 Wohneinheiten für bis zu 700.000 Menschen sowie zahlreiche Gewerbegebäude zu schaffen.

The Forest City project is expected to fuel the region’s economy, as well as Singapore, as light rail and road links will ultimately make the connection across the island state.

Die Anfänge has been involved since the early phases of the project for the supply of its Groutec S precast solution. Groutec allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, Groutec S Für die Verbindung der Paneele wurden Kupplungen (kompakte Modelle) verwendet, wodurch die Scherwände der Wohntürme entstehen.

The Forest City project is supported by the installation at site of several sets of Bartec threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the Groutec S sleeve. The Dextra aftersales team also provided training and support in order to guarantee high production output during the project duration.

For more information about Die Anfänge solutions in Asia, please contact our Büro in Bangkok

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm is the world’s largest vertical farm, a sprawling indoor farming facility spanning an impressive 330,000 square feet. This state-of-the-art facility plays a crucial role in providing fresh, locally sourced in-flight food for Emirates and several other airlines operating at Dubai International Airport. At the core of this groundbreaking project lies meticulous engineering, and one crucial component that contributes to its success is the use of Dextra Groutec couplers for the precast shear wall module connections.

Diese vertikale Farm nutzt modernste Technologie, um eine Vielzahl von Nutzpflanzen in einer kontrollierten Umgebung anzubauen. Durch die vertikale Stapelung von Pflanzenschichten maximiert die Anlage die Raumausnutzung und minimiert gleichzeitig den Ressourcenverbrauch. Das Ergebnis ist ein nachhaltiges und effizientes System, das unabhängig von den äußeren klimatischen Bedingungen das ganze Jahr über frische, qualitativ hochwertige Produkte produziert.

Die Rolle der Dextra-Groutec-Kupplungen

In any construction project, the choice of materials and components is critical to ensuring structural integrity and long-term durability. In the case of the world’s largest vertical farm, the engineers faced the challenge of connecting precast shear wall modules securely. The solution came in the form of Groutec L couplers with a diameter of 25mm.

Groutec couplers are renowned for their reliability and strength in connecting precast concrete elements. These couplers provide a robust and efficient means of joining precast concrete components, ensuring the structural stability of the entire facility. The 25mm diameter was carefully selected to meet the specific requirements of the shear wall modules, offering a seamless connection that enhances the overall resilience of the vertical farm.

Die Groutec-Kupplungen erleichtern nicht nur die strukturelle Integrität der vertikalen Farm, sondern stehen auch im Einklang mit dem Engagement des Projekts für Nachhaltigkeit. Die Haltbarkeit und Zuverlässigkeit dieser Kupplungen stellen sicher, dass die Verbindungen dem Test der Zeit standhalten, was die Langlebigkeit der Anlage und ihren Beitrag zu einer nachhaltigen Landwirtschaft unterstützt.

AVE Palencia-Santander HSR Paket 1 (Palencia – Palencia Norte) & Paket 2 (Palencia Norte – Amusco)

AVE Palencia-Santander high-speed rail project is a significant infrastructure undertaking aimed at connecting Palencia and Santander in Spain. This project involves the construction of extensive railway networks, viaducts, and bridges, underscoring the need for a strong and resilient foundation. Recognising the critical importance of ensuring the structural integrity of the concrete piles, the project management sought advanced testing methodologies.

Die Anfänge played a pivotal role in ensuring the robustness of the project’s foundation by supplying Sonitec Crosshole Sonic Logging (CSL) testing tubes. These tubes were instrumental in conducting comprehensive structural integrity tests on the concrete piles of AVE Palencia-Santander USR Package 1 (Palencia – Palencia Norte) and Package 2 (Palencia Norte – Amusco).

Crosshole Sonic Logging ist eine zerstörungsfreie Prüfmethode, die häufig zur Beurteilung der Qualität und Integrität von Betonpfählen eingesetzt wird. Dabei werden Schallwellen eingesetzt, die zwischen zwei Zugangsrohren durch den Beton übertragen werden, sodass Ingenieure die Materialeigenschaften bewerten und potenzielle Mängel identifizieren können.