Dextra-Gruppe | Zuverlässige Verbindungen

Raffinerieterminal Jizan

Jizan Refinery Terminal: A Major Oil Infrastructure for Saudi Aramco

The Jizan Refinery & Terminal is a large-scale oil megaproject built for Saudi Aramco in the Jizan Economic Area, located on the Red Sea, on the west coast of Saudi Arabia.

For this project, Dextra engineered and manufactured marine tie bars systems, which were used in the construction of the quays of the marine terminal.

In total, Dextra delivered 412 tie rod sets in size M98. The Grade 500 steel rods were connected to combi walls on both sides using Dextra-designed captive nut accessories, which were cast into the concrete piles. Captive Nuts allow a 5° angle of adjustment in all directions, ensuring flexibility during installation.

Each assembly, measuring up to 36 meters in length, was divided into three main segments and reconnected using couplers and hinge couplers for efficient transport and installation.

.


Für weitere Informationen zur Verfügbarkeit von Hochleistungs-Stangenlösungen im Nahen Osten wenden Sie sich bitte an unser Büro in Dubai

Al-Zour LNG-Importterminal

Al-Zour LNG Import Terminal: The World’s Largest LNG Import Facility

The Al-Zour LNG Import Terminal is the world’s largest liquefied natural gas (LNG) import terminal, located 90 kilometers southeast of Kuwait’s capital.

The project included the construction of:

  • A re-gasification facility
  • Eight LNG storage tanks, each with a capacity of 225,000 m³
  • Marine facilities, including two marine jetties and berthing facilities for loading
  • Other components such as 14 HP pumps, boil-off gas (BOG) and flare facilities

The facility was expected to produce approximately 22 million metric tonnes (MMT) of natural gas per year and have a storage capacity of 1.8 million m³ of LNG. The liquefaction capacity of the terminal was estimated at 30 billion cubic meters per day (bcm/d).

Dextra’s Contribution to the Marine Facilities:
For this project, Dextra supplied:

  • 202 tons of Grade 700 Verbindungsstangen für die Schifffahrt, used as anchors between sheet piles or concrete walls
  • 166 tons of waling beams, essential for reinforcing the marine infrastructure

The Al-Zour LNG Import Terminal was completed in November 2021 and reached full operations in February 2022. The terminal now plays a critical role in Kuwait’s energy infrastructure, providing the country with a stable gas network to support energy diversification and sustainable energy initiatives.

Bildnachweis: Hyundai Engineering Co.

Maitree Super Thermal Power-Projekt

Maitree Super Thermal Power Project: A Bangladesh-India Joint Initiative

The Maitree Super Thermal Power Project is a 2×660 MW coal-fired power station being developed by the Bangladesh-India Friendship Power Company (BIFPCL), a 50-50 joint venture between the governments of Bangladesh and India. The power station is located in Rampal, Bangladesh.

For this project, Dextra supplied more than 400 assemblies of Grade 700 Marine Tie Bar systems to connect piles and waling beams for a 1.2 km-long jetty at the coal power plant.
Dextra’s Marine Tie Bar systems consist of steel bars and anchorage accessories, which function as anchorage to tie back seawalls to anchor walls.

Key Features of Dextra’s Marine Tie Bar Systems:

  • Available in three carbon steel grades, with yield stress up to 700 MPa.
  • Selection of 24 bar diameters, up to M162, ensuring optimal performance for various project requirements.
  • Standard range of anchorage components, allowing easy installation and connection to all types of marine walls.

The construction of the Maitree Super Thermal Power Project began in 2017 and was planned for completion by 2022.

Karimun-Hof

Karimun Yard: A Key Fabrication Facility in Indonesia

The Karimun Yard is located on the small island of Karimun, Indonesia, less than 25 km from Batam and Singapore. Operated by Saipem, the yard offers over 780,000 sqm of fabrication areas with an annual production capacity of 50,000 tons.

Between 2009 and 2010, Dextra manufactured and supplied large Marine-Verbindungsstangen for Saipem, which were incorporated into the main quay wall. Additionally, in 2008, Dextra supplied Marine Tie Bars and Waling Beams, connecting the sheet pile walls of the service jetty.

Marine Tie Bar Systems: High-Performance Solutions:
For the main yard, Dextra supplied its Grade 700 Marine-Verbindungsstangen, the highest grade in the range.

  • Höher tie bar grades allow for high performance while reducing the size and weight of the bars, making transportation and installation easier.
  • Grade 700 also enables design optimization, allowing bars to be spaced further apart, thus reducing the total number of bars required for the project.

Connection & Splicing Systems:
To connect the bars to the walls, ball cages were used.

  • When used with a bearing plate embedded in the wall, ball cages allow a multidirectional adjustment angle of 10° for greater installation flexibility.
  • To splice bar segments, couplers were also used, ensuring a strong and secure connection.

For more information about our marine solutions in Asia Pacific, please consult our Bangkok

*CF Saipem Yard Sheet 07.2014

Hyosung LPG-Höhle

Hyosung LPG Cavern: Ein groß angelegtes Petrochemie-Lagerprojekt

Dieses mehrphasige Projekt, das von der Hyosung Group entwickelt wurde, umfasst den Bau von:

  • Eine Anlage zur Produktion von Propan-Dehydrierung (PDH)
  • Eine Polypropylen (PP)-Anlage
  • Ein Flüssiggas-Lagertank (LPG)
  • Lagerhallen für Flüssiggas und petrochemische Produkte

Der gesamte Komplex wird sich über 60 Hektar im Industriegebiet Cai Mep in Ba Ria-Vung Tau in der Nähe von Ho-Chi-Minh-Stadt, Vietnam, erstrecken.

Dextra unterstützt den Bau des unterirdischen Flüssiggasspeichers mit einer Kapazität von 240.000 Tonnen durch die Lieferung von 30.000 Einheiten Felsanker aus glasfaserverstärktem Kunststoff (GFK)Mit diesen Bolzen wird die Felswand der Höhle rund um den 150 Meter tiefen Aushubbereich befestigt.

Um Öllecks effektiv zu verhindern, wird Meerwasser in das umgebende Gestein injiziert, wodurch ein Wasservorhang entsteht. Angesichts der stark korrosiven Umgebung GFK-Felsanker sind aufgrund ihrer Korrosionsbeständigkeit die ideale Lösung.

Vorteile von Dextra GFK-Felsbolzen:

  • Schneidbare Bergbauanker auf Basis von vollgewindeten GFK-Sehnen
  • Erhältlich in sieben Durchmessern (von 20 mm bis 40 mm)
  • Lieferung mit GFK-Platten und Muttern
  • Leichtgewichtig, daher einfach zu handhaben, zu transportieren und im Tunnel zu installieren

Die Anlagen werden voraussichtlich im Jahr 2020 den kommerziellen Betrieb aufnehmen.

Modernisierung der Visakh-Raffinerie

Modernisierung der Visakh-Raffinerie

Das Projekt zur Modernisierung der Visakh-Raffinerie ist eine Brownfield-Erweiterung der Visakh-Raffinerie in Visakhapatnam, Indien.

Das Projekt wird die Raffineriekapazität von 8,3 Mio. Tonnen pro Jahr (Millionen Tonnen pro Jahr) auf 15 Mio. Tonnen pro Jahr erweitern und gleichzeitig die Produktion und den Vertrieb von Kraftstoffen ermöglichen, die der Bharat-Stufe VI entsprechen, einem neuen Emissionsstandard der indischen Regierung.

Dextra war an der Erweiterung beteiligt, indem es Unitec-Schraubkupplungen für vorgefertigte Trägerverbindungen lieferte.

Unitec ist ein Schraubverbindungssystem, das für die Verbindung zweier Bewehrungsstäbe ohne Gewinde konzipiert ist: Seine Schrauben fixieren beide Stabenden und vervollständigen die Verbindung.

Das Projekt zur Modernisierung der Visakh-Raffinerie soll 2020 abgeschlossen sein.