Dextra-Gruppe | Zuverlässige Verbindungen

Suche
Schließen Sie dieses Suchfeld.

EIN Limassol-Turm

EIN Limassol-Turm

ONE Limassol Tower is a commercial building and a new landmark of Limassol, Cyprus. The project aims to position the island on the international luxury property market, enhancing the attractiveness of the country for foreign investment by offering world-class residence, amenities and services. This will also boost Cyprus’ economy, while increasing local employment opportunities.

At 170 meters above ground with 33 storeys in total, the ONE Limassol Tower is the tallest seafront residential project in Europe. The building will host 83 luxurious apartments, including a three-storey penthouse.

For the reinforcement of this landmark building, Dextra delivered its rebar couplers and bar-end preparation machine sets to the contractor J&P and ACC JV, which is a joint-venture between Joannou & Paraskevaides Group (J&P) and Arabian Construction Company (ACC).

More than 60,000 Bartec couplers were used for rebar splicing in rafts and vertical parts of the building.

The completion of this iconic project is scheduled in 2019.

National Bank of Kuwait – New Headquarter

National Bank of Kuwait – New Headquarter

The new headquarters building of the National Bank of Kuwait is a 300m-tall tower that covers a total floor area of 127,000m2 with a design concept inspired by pearl shells and located in the heart of Kuwait City’s financial district.

The main construction comprises composite concrete and steel, while the cladding on the fins and glass façades is predominantly glass-reinforced concrete.

Dextra took part in reinforcing the concrete structure of the building by providing these solutions:

  • 100,000 Bartec couplers were installed for columns reinforcement, construction joints in raft and slab/beam to core wall connections.
  • 35,000 headed bars act as shear studs in raft.
  • 1,500 Unitec bolted couplers were used to extend existing reinforcing bars that were either not threaded or too short for lapping. It is a convenient solution to connect rebars by using a simple pneumatic wrench at the construction site, without the need of any rebar preparation.
  • Die Plum-Eigentumswohnung | พลัมคอนโด

    Die Plum-Eigentumswohnung | พลัมคอนโด

    Die Plum Central Station ist ein 38-stöckiges Eigentumswohnungsprojekt, das aus zwei Türmen besteht und in der Nähe der erhöhten U-Bahn-Station Bang Yai im Nordwesten von Bangkok liegt. Das Wohngebäude wird 1.013 Wohnungen beherbergen.

    Die Phase 1 des Projekts (erster Turm) begann im September 2015 und wird etwa im März 2018 abgeschlossen sein. Der schnelle Bau wird durch den Einsatz von „vollständig vorgefertigten“ Betontechniken ermöglicht.

    Der Eigentümer des Projekts Pruksa betreibt für dieses Projekt ein eigenes Fertigteilwerk.

    Das Ziel von Pruksa bei diesem Projekt bestand darin, schnell vorgefertigte Paneele (die als Scherwände fungieren) für alle oberirdischen Ebenen errichten zu können. Dextra empfahl zu diesem Zweck die Verwendung von Groutec-Kupplungen.

    Groutec-Kupplungen, montiert auf zuvor mit Bartec-Gewinde vorbereitetem Bewehrungsstab Ø25 mm. Die an der Unterseite jedes Fertigteilelements angebrachten Verbindungsstücke werden dann als Teil des vorgefertigten Wandpaneelelements gegossen.

    Nach dem Anheben des Elements in das bauseitige Obergeschoss erfolgt der erneute Anschluss an die überstehende Bewehrung durch Injektion von schwundfreiem Mörtel. Es ist zu beachten, dass Dextra den Mörtel nicht liefert, sondern dieser vor Ort bezogen werden kann, was zu erheblichen Einsparungen führt. Nach dem Einspritzen des Fugenmörtels kann die Verstrebung um jede Platte nach 3 Tagen entfernt werden.

    Weitere Informationen zur Plum Central Station und der Groutec-Anwendung finden Sie in unserer Fallstudie.

     

    Big-Box-Einzelhandel

    Big-Box-Einzelhandel

    Dieses neue vierstöckige Einzelhandelszentrum wurde mit einer innovativen Optimierung der Klimaanlagenbelastung so konzipiert, dass es einen möglichst geringen CO2-Fußabdruck hat.

    Es befindet sich in Jebel Ali, Dubai, Vereinigte Arabische Emirate, mit einer Grundfläche von 81.000 m² und einer vermietbaren Fläche für über 100 Einzelhandels- und Concept Stores.

    Die in den vorgefertigten Platten enthaltenen Dextra-Groutec-Kupplungen ermöglichten eine einfache und schnelle Montage vor Ort. Es wurden mehr als 1.100 Einheiten Groutec L 25 und 32 mm geliefert.

    Groutec ist eine leistungsstarke Fertigteilverbindungslösung, die bequem einzurichten und vor Ort durch Mörtelinjektion schnell zu installieren ist. Es unterstützt die Verbindung von Betonfertigteilstützen, -platten und -trägern.

    Die Fertigstellung der ersten Phase des Einzelhandelszentrums ist für 2019 geplant. Die zweite Phase wird ein Wohngebiet umfassen, um ein neues Lifestyle-Zentrum in Dubai zu schaffen.

    Trinity Tower La Défense

    Trinity Tower La Défense

    Der Trinity Tower im Geschäftsviertel La Défense westlich von Paris ist ein neuer 33-stöckiger und 140 Meter hoher Büroturm mit über 52.000 Quadratmetern Bürofläche.

    Ziel des Projekts ist es, sowohl soziale als auch ökologische Auswirkungen vor Ort zu erzielen, indem große öffentliche Außenflächen hinzugefügt werden, die zuvor durch die Straße getrennte Bereiche wieder miteinander verbinden. Es wird außerdem über Grünflächen, eine Dachfläche und offene Fassaden verfügen und eine LEEDS-Zertifizierung erhalten.

    Für dieses Projekt lieferte Dextra über seinen französischen Vertriebshändler SNAAM Vernon über 18.000 Stück FORTEC® Bewehrungsanschlüsse.

    Bewehrungskupplungen ermöglichen eine schnellere Baugeschwindigkeit, indem sie eine schnelle und sichere Möglichkeit bieten, Bewehrungsstäbe zu verbinden: einen Stab nach dem anderen, in Bündeln oder Käfigen. Im Falle von Bündeln und Käfigen können diese außerhalb des Standorts zusammengebaut und am endgültigen Standort einfach durch Kupplungen wieder verbunden werden.

    Die Fertigstellung des Trinity Tower ist für 2019 geplant.

    Für weitere Informationen zur Verfügbarkeit von Bewehrungsverbindungslösungen in Frankreich wenden Sie sich bitte an unser Pariser Büro für mehr Informationen.

    Erster Akt | Zweiter Akt: Turm

    Erster Akt | Zweiter Akt: Turm

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Floresta Gardens Towers – Die Perle

    Floresta Gardens Towers – Die Perle

    Das Floresta Gardens-Projekt umfasst den Bau der Türme im The Pearl Qatar.

    Das Projekt umfasst den Bau mittelgroßer Wohntürme und Villen innerhalb von drei geschlossenen Villenanlagen, darunter ein 2.452 Quadratmeter großes Einkaufszentrum. Das Quartier verfügt über eine Bruttogeschossfläche von 267.471 Quadratmetern, 145.967 Quadratmeter bebaubares Grundstück und 5.000 Wohneinheiten.

    Beim Fertigteilbau der Türme war Dextra Groutec maßgeblich beteiligt. Über 30.000 Groutec L-Kupplungen in den Größen 20 mm bis 40 mm wurden für vertikale Verbindungen auf der Baustelle in Säulen eingesetzt.

    Die Groutec-Fertigteilkupplung ist eine innovative Lösung für die schnelle und einfache Verbindung von Betonfertigteilen. Es wird weltweit häufig bei Wohn- und Gewerbebauprojekten eingesetzt.

    Jeddah-Turm

    Jeddah-Turm

    Der Jeddah Tower (früher bekannt als Kingdom Tower) ist ein markanter Wolkenkratzer am Roten Meer im Norden von Jeddah, Saudi-Arabien.

    Das Geschäftsgebäude soll mit einer erwarteten Gesamthöhe von 1.008 Metern erstmals die 1-km-Marke überschreiten und ist damit das höchste Gebäude der Welt.

    Der Jeddah Tower wird letztendlich ein Four Seasons-Hotel mit 200 Zimmern, Serviced Apartments, mehrere Büroetagen und ein Observatorium beherbergen. Insgesamt 59 Aufzüge ermöglichen den Besuchern die Fortbewegung zwischen den Etagen.

    Die Turmstruktur wurde von der Beratungsfirma Thornton Tomasetti entworfen und vom Bauunternehmer Saudi Bin Laden gebaut, den Dextra mit Unterstützung seines lokalen Partners Bahra Steel beliefert.

    Dextra ist stolz darauf, 100% der Bewehrungskupplungen für die Struktur zu liefern, sowohl im Fundament als auch im Überbau.

    An der Struktur werden hauptsächlich zwei Arten von Bewehrungskupplungen verwendet:

    • Für alle Fundamente, Säulen und vertikalen Verbindungen werden Standard-Bartec-Kupplungen verwendet. Diese ermöglichen eine schnelle Verbindung vorgefertigter Käfige.
    • Für Plattenverbindungen werden außerdem spezielle Überbrückungskupplungen verwendet, um jeden Schenkel des U-förmigen Bewehrungsstabs mit einer Stütze zu verbinden.

    Der Turm befindet sich noch im Bau, die Fertigstellung wird für etwa 2019 erwartet.

    Der höchste Fertigteilturm in Indien

    Der höchste Fertigteilturm in Indien

    Galaxy Towers, entwickelt von Aurobindo, ist ein Projekt zum Bau eines 24-stöckigen Bürogebäudes aus Fertigteilen in Hyderabad, Indien.

    Es wird der höchste Büroturm in Indien sein, der mit Fertigteiltechnologie gebaut wird.

    Das Gebäude besteht aus 4 Untergeschossen und 24 Obergeschossen mit einer vermietbaren Fläche von 1,9 Millionen Quadratfuß, die Gesundheitsclubs, Food-Courts, Cafés, ein Business Center, ausreichend Parkplätze und eine Wartelounge umfassen wird.

    Es wird erwartet, dass das Projekt in der Hälfte der Zeit gebaut wird wie bei einer vergleichbaren konventionellen Ortbetonkonstruktion, was zeigt, wie die Fertigteiltechnologie dank ihrer Effizienz an Bedeutung gewonnen hat.

    Für dieses spezielle Projekt lieferte Dextra einen wichtigen Teil der Fertigteilkonstruktion: die Groutec-Verbindung, eine halbvergossene Muffe, die für die Verbindung von Fertigteilelementen konzipiert und in Übereinstimmung mit Eurocode 2, BS 8110, ACI 318, IBC, AASHTO und IS 16172 hergestellt wurde .

    Durch den Einbau von Groutec-Kupplungen in die vorgefertigten Säulen und Wände im Fertigteilwerk wird die schnelle und sichere Verbindung von Wänden oder Säulen durch das Einspritzen von zementhaltigem, nicht schrumpfendem Mörtel durch den Einlass in die Muffen vor Ort erreicht. Für dieses Projekt wurden 102.000 Groutec-Kupplungen geliefert.

    Die Fertigstellung der Galaxy Towers wird für 2020 erwartet.

    (Bildnachweis: Aurobindo Realty & Infrastructure Private Limited unter https://bit.ly/37DW7IT)

    King Salman Energy Park (SPARK)

    King Salman Energy Park (SPARK)

    Der King Salman Energy Park (SPARK) ist ein neues Industriestadtprojekt, das zwischen Dammam und Al-Ahsa in der Ostprovinz Saudi-Arabiens errichtet wird.

    Ziel des Projekts ist es, auf die ständig wachsende Nachfrage des Landes nach energiebezogenen Produkten und Dienstleistungen zu reagieren, darunter Exploration, Produktion, Raffination, Petrochemie, konventionelle Energie, Wasserproduktion und -aufbereitung sowie Bohrungen.

    Bis zum Abschluss der ersten Phase im Jahr 2021 wird SPARK in fünf Hauptzonen unterteilt: Industriezone, Trockenhafen- und Logistikzone, Geschäftsviertel, Schulungszentren und Wohnanlagen sowie kommerzielle Aktivitäten.

    Dextra lieferte rund 700.000 ASTEC-GFK-Bewehrungsstäbe (Glasfaserverstärktes Polymer), Modell GR45P, in gerader und gebogener Form für Gebäude und Gehwege.

    Der Bewehrungsstab ASTEC GFRP GR45P bietet einen Elastizitätsmodul bei 45 GPa und Zugfestigkeiten gemäß ASTM 7205 – 06. Er kann als Verstärkungsmaterial sowohl für neue als auch für bestehende Konstruktionen verwendet werden.

    Nach der voraussichtlichen Fertigstellung der 3. Phase im Jahr 2035 wird es eine Fläche von 50 Quadratkilometern einnehmen und voraussichtlich 100.000 Arbeitsplätze schaffen.

    Bitte geben Sie Ihre Daten ein

    Kontaktiere uns

       Teilen Sie uns Ihre Informationen mit und wir werden uns so schnell wie möglich bei Ihnen melden.