Dextra-Gruppe | Zuverlässige Verbindungen

Suche
Schließen Sie dieses Suchfeld.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential Bartec Und Groutec S systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

 

Bartec, renowned for its mechanical splicing capabilities, and Groutec S, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 

The Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 
 

The Foundation for Public Housing Development at Pik Wan Road stands as a testament to Hong Kong’s commitment to sustainable urban development and infrastructure enhancement. Situated amidst the vibrant cityscape, this construction project embodies a convergence of innovative engineering and community-focused initiatives.

At the heart of this endeavor lies the crucial aspect of slope stabilization—a fundamental requirement in Hong Kong’s hilly terrain, where land development often necessitates meticulous attention to structural integrity. Recognizing the significance of this aspect, the project turned to advanced solutions, seeking to marry effectiveness with environmental responsibility.

Enter Die Anfänge, a renowned provider of engineering solutions renowned for its commitment to quality and innovation. Dextra’s contribution comprised over a thousand pieces of Glass Fiber Reinforced Polymer (GFRP) Soil Nails — a cutting-edge solution designed to address the specific challenges of slope stabilization. GFRP Soil Nails offer superior corrosion resistance, durability, and ease of installation while minimizing environmental impact.

Dextra’s GFRP solutions have earned the esteemed approval of various authoritative bodies in Hong Kong, including the Buildings Department, a crucial entity overseeing building codes, safety standards, and inspections. Additionally, they have garnered recognition from the Hospital Authority, ensuring their reliability and suitability for healthcare infrastructure. Moreover, recognition from the Housing Department and the Construction Innovation & Technology Fund (CITF) signifies their innovative edge and contribution to advancing construction practices in Hong Kong.

 

Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec BF couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm Bartec BF couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Indonesia Warehouse

 

Uniqlo & Hive Indonesia Warehouse

 

Indonesia’s building construction has spurred a need for rapid and efficient construction methods capable of meeting the demands of a burgeoning population. Precast construction has emerged as a solution to these challenges as it helps minimize on-site labor requirements, accelerates project timelines, and ensures consistent quality.

At the heart of successful precast construction lies the seamless connection between structural elements. Dextra supplied Groutec precast couplers for projects around the world, including Indonesia. Groutec in size 20mm were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, facilitating rapid and reliable assembly while ensuring structural integrity.

The couplers have minimized on-site labor requirements and accelerated project milestones. This not only translates to cost savings but also ensures timely delivery, allowing the building to fulfill its intended purpose sooner. Additionally, the couplers’ high-strength steel composition and stringent quality control measures guarantee robust connections that withstand the rigors of dynamic structural loads.

 

MahaNakhon-Turm

MahaNakhon-Turm

Der MahaNakhon Tower ist ein 77-stöckiger Wolkenkratzer in Bangkok. Mit einer Höhe von 314 Metern wurde es 2016 zum höchsten Gebäude Thailands. MahaNakhon liegt in Silom, dem belebtesten Geschäftsviertel Bangkoks, direkt über der BTS-Skytrain-Station Chong Nonsi. Das Projekt gehört dem Entwickler PACE und wurde von Bouygues-Thai gebaut.

Stiftungen

Fundamente sind in Bangkok immer eine Herausforderung. Da die Stadt auf Sand und feuchten Böden gebaut wird, müssen die Fundamente tief sein und die meisten Projekte verfügen über dicke D-Wände, um das Eindringen von Wasser zu verhindern.

Für die D-Walls von MahaNakhon lieferte Dextra Bewehrungskupplungen, die in den D-Walls verwendet werden. Die Kupplungen wurden auf Hakenstangen montiert, horizontal eingebaut und einbetoniert. Diese typische Anwendung ermöglicht die erneute Verbindung der Stäbe mit der D-Wand zu einem späteren Zeitpunkt, wenn mit der Plattenbewehrung begonnen wird.

Abschließend wurden auch Kopfstäbe in die dicke Fundamentmatte eingebaut. Kopfstangen sind ein vorteilhafter Ersatz für Haken in beengten Bereichen, sie bieten eine leistungsstarke Verankerung und sind einfacher zu installieren.

Überbau

Der Turm ist um eine mit Gleitschalung errichtete Kernwand herum gebaut, die von 12 Megasäulen umgeben ist. Um die Säulen mit der Kernwand zu verbinden, lieferte Dextra Bouygues-Thai mit seinen renommierten Bartec Lösung. Bartec Kupplungen, die bündig mit der Schalung installiert und in Beton gegossen werden, ermöglichen die erneute Verbindung von Stäben in einem zweiten Satz, um die Stütze und die Kernwand zu überbrücken.

In den Megasäulen wurden auch Bewehrungskupplungen verwendet, um vertikale Verbindungen von Stab zu Stab herzustellen.

Skybar

Schließlich stellte Dextra zur Verfügung Zugstangensysteme in der Skybar auf dem Dach. Spannstangen lassen sich mit ihren Gabelenden einfach montieren und bieten ein ästhetisches Verankerungssystem.

Für weitere Informationen zu Dextra-Lösungen für MahaNakhon steht auch eine Fallstudie mit Fotos zur Verfügung.

mahanakhon_tower_case_study

Broschüre herunterladen

Ciel Tower Dubai

Ciel Tower Dubai

Der Ciel Tower ist ein 82-stöckiges Hochhaus in der Dubai Marina, das derzeit entwickelt wird. Mit einer Gesamthöhe von 365 Metern soll das Gebäude nach seiner Fertigstellung Ende 2023 das höchste Hotel der Welt werden.

Der Turm liegt im Herzen der Marina, in der Nähe beliebter Attraktionen wie dem Marina Walk und dem Einkaufs- und Unterhaltungskomplex Marina Mall. Es wird 1.042 Luxussuiten mit einer Dachterrasse beherbergen, auf der sich eine Poolbar, ein Restaurant und eine Aussichtsplattform befinden.

Die Struktur ist stark vom Konzept des vertikalen Wohnens inspiriert, um den Blick auf Palm Jumeirah, Blue Waters Island, den Hafen von Dubai und den Arabischen Golf zu maximieren.

Dextra hat 180.000 Bartec-Kupplungen für die Verbindung und Verstärkung von Flößen, Säulen mit Balken, Platten mit Kernwänden, Kernwänden und Starterstangen geliefert.

Der Ciel Tower ist ein bemerkenswertes Projekt, das zu einem neuen Wahrzeichen werden und den Ruf Dubais als eines der beliebtesten Touristenziele der Welt weiter stärken wird.

Quelle der Bilder: https://www.archdaily.com/931860/ciel-the-worlds-tallest-hotel-is-under-construction-in-dubai-marina, https://propsearch.ae/dubai/ciel- Turm

Indiens höchstes Geschäftsgebäude, gebaut mit Fertigteiltechnologie

Indiens höchstes Geschäftsgebäude, gebaut mit Fertigteiltechnologie

Orbit ist ein 25-stöckiges Bürogebäude, das strategisch im Herzen des IT-Zentrums von Hyderabad liegt und mit Fertigteiltechnologie errichtet wird. Es handelt sich um das höchste Gewerbegebäude in Indien, das mit Fertigteiltechnologie gebaut wurde.

Das von Aurobindo Realty errichtete Orbit-Gebäude wurde bei den International Property Awards – Asia Pacific Property Awards 2018 – mit der Auszeichnung „Best Office Architecture India“ ausgezeichnet.

Da das Gebäude mit Fertigteiltechnologie entworfen wurde, ist es auch für das LEED V4 Gold Rating von USGBC vorgeschlagen, eine Zertifizierung, die unser Engagement für Umweltfreundlichkeit und Nachhaltigkeit garantiert.

Dextra Groutec spielte eine Schlüsselrolle bei der Verbindung von Fertigteilen. Rund 60.000 Kupplungen wurden im Fertigteilwerk in die Fertigteile eingebaut und anschließend zur Baustelle transportiert, um dort eine Vergussverbindung herzustellen.

Groutec-Kupplungen werden häufig als Reaktion auf die gestiegene Nachfrage nach modularen Gebäuden auf der ganzen Welt eingesetzt, insbesondere während dieses Covid-19-Ausbruchs mit höheren Anforderungen an Gesundheits- und Quarantänegebäude. Sie werden gemäß Eurocode 2, BS 8110, ACI 318, IBC und AASHTO entwickelt und hergestellt.

Bildquelle: https://www.aurobindorealty.com/portfolio/orbit/

Bitte geben Sie Ihre Daten ein

Kontaktiere uns

   Teilen Sie uns Ihre Informationen mit und wir werden uns so schnell wie möglich bei Ihnen melden.