The New Champlain Bridge is a 3 km-long bridge spanning the Saint Lawrence River at the southeastern entrance of Montreal, Quebec, Canada. As one of the busiest bridges in Canada, it plays a crucial economic role for the city, serving as a key route to the United States, located 60 km south.

 

Replacing the Older Champlain Bridge

The New Champlain Bridge is replacing the existing Champlain Bridge, which was commissioned in June 1962. The older structure began showing signs of corrosion in 1994. After several temporary safety measures were implemented to keep the bridge operational, a replacement project was initiated in 2007. For a time, both bridges will stand side by side until the older structure is fully dismantled, with most of its materials planned for recycling.

 

A Focus on Corrosion Resistance

The New Champlain Bridge is designed to last at least 125 years and accommodate 50 million vehicle crossings per year. Given the corrosive environment caused by frequent road de-icing, corrosion resistance was a top priority. Duplex stainless steel rebar was installed in critical areas to enhance durability.

For this project, Dextra recommended using Duplex Stainless Steel Rolltec couplers and anchors. This specialized version of our Rolltec® system replaces standard couplers and anchors with an improved duplex steel alternative, offering superior corrosion resistance.

The Rolltec® solution is well-suited to the Canadian market and is approved by the Quebec Ministry of Transport. With a single-operator threading machine and 30-second threading cycles, it provides high productivity, making it ideal for high-labor-cost markets like Canada.

More than 10,000 Stainless Rolltec® couplers were supplied for this project, primarily for bridge spans. These couplers were used to splice large-diameter reinforcement bars, ranging from 35M (#11) to 55M (#18)—the largest size available in our Rolltec® range.

Additionally, about 10,000 Rolltec® stainless steel end anchors were delivered for sizes up to 55M (#18). Rolltec® Headed Bars use the same threading system as the couplers, simplifying production and installation.

Verwandte Lösungen

Sachverstand

In jedem Moment Ihrer Customer Journey widmen sich die Dextra-Teams der Entwicklung intelligenter Baulösungen, die es unseren Kunden ermöglichen, auf ihren Baustellen ein höheres Produktivitäts- und Sicherheitsniveau zu erreichen.

Dextra verfügt über physische Lagerbestände auf mehreren Kontinenten, die in jedem Land durch die lokalen Lagerbestände unserer Vertriebshändler ergänzt werden. Mit diesem erweiterten Netzwerk stellt Dextra sicher, dass unsere Produkte immer erreichbar sind, egal wo sich unsere Partner befinden.

Für Lösungen, die individuell angepasst werden müssen, kann Dextra auch über unsere Standardlieferzeiten hinausgehen und beschleunigte Lieferpläne anbieten. Für weitere Informationen wenden Sie sich bitte an uns.

An drei großen Industriestandorten in Bangkok (Thailand), Guangzhou (China) und Pune (Indien) besitzt Dextra seine Produktionsanlagen und -prozesse vollständig. Dadurch haben wir die vollständige Kontrolle über den Zeitplan unserer Abläufe und die Qualität der produzierten Lösungen.

Ein unabhängig akkreditiertes Materialprüflabor, akkreditiert nach ISO-IEC17025, befindet sich im Hauptwerk von Dextra in Bangkok und ermöglicht die Prüfung von Materialien und Produkten.

Ziel von Dextra ist es, Produkte zu liefern, die die anspruchsvollsten internationalen technischen Zulassungen übertreffen, und es ist unser Ziel, maximale Kundenzufriedenheit zu schaffen, indem wir die Bedürfnisse und spezifischen Anforderungen unserer Kunden erfüllen.