Dextra-Gruppe | Zuverlässige Verbindungen

Tunnelbau und Bergbau

Tunnelbau and Mining

Typische Anwendungen

Soft-eye FK wall for easy penetration of TBM through retaining walls.

Für Dach- und Wandverschraubungen sowohl bei temporären als auch bei dauerhaften Anwendungen

Unsere Lösungen

image 50 (1)
Innovative FK solution for efficient tunnel excavation ASTEC™ FK combination bolt is a unique and innovative Glass Fiber Reinforced Polymer solution precisely designed by Dextra. In unconsolidated excavation areas, like steel bolts, FK Combination Bolts can be automatically installed by a jumbo machine or manually installed. Thanks to the characteristics of the FK material, Combination Bolt can easily be cut by common excavation equipment, which makes the product an ideal solution for temporary application for tunnel excavation projects. Eurocode 2, BS 8110, DIN 1045, ACI 318, IBC, AASHTO, ASME Sec III Div 2.
image 50 (1)
Tunnel breakthrough made easy with FK rebar ASTEC Soft–Eyes allow the penetration of Tunnel Boring Machines (TBM) through Schlitzwände and secant piles. This unique technology uses cuttable Glass Fiber Reinforced Polymer (GFK) Bewehrung as an advantageous replacement for conventional steel rebars. The Soft-Eye technology was developed by Dextra in 1996 and successfully implemented for the first time on Bangkok MRT subway stations. The Soft-Eye technology has since become a standard concept in the design of launching/receiving shafts and subway stations. We have successfully supplied over 500 soft-eyes on all continents. Dextra offers an integrated turnkey solution that includes design, optimization, manufacturing, logistics, and on-site training.
image 50

GEOTEC-Gitterträgersysteme sind leichte, dreidimensional gebogene Stahlrahmen, die aus Hauptstäben, Nebenstäben, Verbindungsplatten, Fußplatten und Aussteifungen zusammengesetzt sind.

The lattice girder can provide immediate support for Tunnelbau Umgebungen.

Der Biegeradius wird individuell an die Anforderungen jedes Projekts angepasst.

Schirmpfeife

Ein Vorunterstützungssystem für schwache Böden

Das GEOTEC™-Schirmrohrsystem ist eine Vorunterstützung bei weichen und schwachen Bodenverhältnissen. Das System besteht aus Stahlrohren, die von der Tunnelwand aus installiert werden, um ein Dach zu bilden und die Tunnelvortriebe zu stabilisieren. Durch die Lastverteilung in Längsrichtung kann die Verformung beim Aushub verringert werden.
Der Stützmechanismus des Schirmrohrverfahrens besteht darin, die Baugrube sowohl in Quer- als auch in Längsrichtung durch eine bogenförmige Verstärkungszone zu stabilisieren. Das Unterstützungssystem kann in drei verschiedene Aspekte unterteilt werden:
Radiale Unterstützung. Längsunterstützung
Unterteilung der Freiflächen der freitragenden Zone

Stahl-Kombinationsbolzen

Immediate and permanent rock bolting solution GEOTEC™ steel combination bolt is suitable for the most stringent requirements. A mechanical bolt combined with a corrugated pipe and a double grout layer all along the tendon to provide both high bonding and protection against corrosion (similar to Double Corrosion Protection / DCP). It is initially installed for immediate support by the use of an expansion shell, to be fully grouted at a later stage allowing it to be classified as permanent application. bent Bewehrung bars while being simpler and faster to install.
image 50
Cuttable mining anchor GEOTEC™ FK solid rock bolt is a rock-bolting system based on a fully threaded GFK tendon. It is specially designed for the following applications: Face-bolting and temporary applications: The cutability of FK makes it the ideal solution for face bolting or any other Tunnelbau/mining application where further excavation is required. Cohesive soil & hard rock. GEOTEC FK is installed into pre-drilled holes. Installation with grout or with resin cartridges.
image 50

Bohren, Verfugen und Ankern in einem!

GEOTEC Steel self-drilling rock bolt is a rock-bolting system based on a fully coarse threaded hollow bar.
Besonders empfehlenswert ist es für folgende Anwendungen:
Dach- und Wandverschraubung.
All ground conditions. GEOTEC self drilling rock bolts do not require pre-drilling a hole, therefore making it usable even in soft rock conditions.
Installation with grout. The hollow steel anchor rod also acts as a grouting pipe to ease setup. For non-grouting applications, please refer to the mechanical anchor or expandable friction bolt.
Temporäre oder dauerhafte Bewerbungen. Mit optionaler Epoxidbeschichtung für dauerhafte Anwendungen erhältlich.

image 50 (1)
FK hollow rock bolt

ASTEC FK hollow rock bolt is a rock-bolting system based on fully threaded hollow GFK bars. It is specially designed for the following applications:

Stirnbolzen und temporäre Anwendungen: The cut-ability of FK makes it the ideal solution for face bolting or any other tunneling/mining application where further excavation is required.

Cohesive soil & hard rock conditions: ASTEC is inserted into a pre-drilled hole. For a non-cohesive soil environment, refer instead to FK Self-Drilling Bolts.

Verlegung mit Fugenmörtel: The hollow GFK anchor rod also acts as a grouting pipe to ease installation.