Groutec L is a mechanical splicing designed for the connection of precast elements.
Each Groutec L sleeve features a threaded end for the connection to reinforcement bars at the precast factory and a wide body allowing for more misalignment tolerance for the connection of two precast elements at site.
Groutec L is designed and manufactured in compliance with Eurocode 2, BS8110, ISO 15835, ACI 318 type 2, and AASHTO code requirements
The Groutec L is compattable with any standard non-shrink grout.
Groutec L is suitable to be used in earthquake-prone areas.
Once filled with grout, bracing
around the element can be
removed after only 3 days.
At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.
Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.
For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.
From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.
An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.
Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.
Share your information with us and we’ll get back to you as soon as possible.