Dextra Group | Reliable Connections

Search
Close this search box.

World's most popular rebar splicing solution​

Bartec® is a high-performance parallel thread
mechanical splice system achieving “bar-break”
performance up to 800MPa under tensile load.
Bartec® not only offers a complete range
of splices that may be required on-site, but
also facilitates handling and stock-keeping by
combining the two most common splices, the
standard and the position splice (when the two
bars cannot be rotated) into one product.

Product features & benefits

Reliable

International certified with major certifications bodies

High productivity​

Easy to install products and state of the equipment

20,000+ projects

Successfully delivered
in more than 40 years.

Equipment features & benefits

3 Steps Process

Related Projects

ES_AVE-Palencia-Santander_Banner

AVE Palencia-Santander HSR Package 1 (Palencia – Palencia Norte) & Package 2 (Palencia Norte – Amusco)

AVE Palencia-Santander high-speed rail project is a significant infrastructure undertaking aimed at connecting Palencia and Santander in Spain. This project involves the construction of extensive railway networks, viaducts, and bridges, underscoring the need for a strong and resilient foundation. Recognizing the critical importance of ensuring the structural integrity of the concrete piles, the project management sought advanced testing methodologies.
Panama Metro Linea 1 & Linea 2

Panama Metro Linea 1 & Linea 2

Panama Metro is a recently finished urban transportation system in the Panama City, capital of Panama.

Jeddah Tower

Jeddah Tower

Jeddah Tower (previously known as Kingdom Tower) is a landmark skyscraper located along the Red Sea in the North of Jeddah, Saudi Arabia.

Related solutions

Advanced 100%-tested rebar splicing system based on male/female sleeves extruded on bar.

Reinforcement anchorage system that acts as an advantageous alternative to hook bars.

Light rebar coupler solution based on threaded bar ends prepared with a single machine.

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Contact us

   Share your information with us and we’ll get back to you as soon as possible.

Please enter your information