Dextra Group | Reliable Connections

Ciel Tower Dubai, UAE

Ciel Tower Dubai, UAE

Ciel Tower is an 82-storey high-rise building under development in Dubai Marina. With a total height of 365 meters, it is set to become the world’s tallest hotel-only building upon its completion, scheduled for 2025.

Located in the heart of Dubai Marina, the tower is near popular attractions such as Marina Walk and Marina Mall, a major shopping and entertainment complex. It will feature 1,042 luxury suites, along with a rooftop hosting a pool bar, a restaurant, and an observation deck.

The architectural design is heavily inspired by the concept of vertical living, maximizing panoramic views of Palm Jumeirah, Bluewaters Island, Dubai Harbour, and the Arabian Gulf.

Dextra has supplied 180,000 Bartec couplers for critical structural connections, including rafts, columns to beams, slabs to core walls, core walls, and starter bars, enhancing the building’s strength and stability.

Ciel Tower is set to become an iconic landmark, further solidifying Dubai’s reputation as one of the world’s premier tourist destinations.

Source of images: https://www.archdaily.com/931860/ciel-the-worlds-tallest-hotel-is-under-construction-in-dubai-marina, https://propsearch.ae/dubai/ciel-tower

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.