Dextra Group | Reliable Connections

Search
Close this search box.

Cairo Monorail

Cairo Monorail

The Cairo Monorail is a two-line monorail rapid transit system in Cairo, Egypt, that is currently under construction. When the project is finished, the two lines will provide the first public transportation linkages from the New Administrative Capital and 6th of October City to the Cairo metropolitan area.

The 54-kilometer line between the New Administrative City and East Cairo will take 60 minutes, while the 42-kilometer line between the 6th of October City and Giza would take 42 minutes.

Dextra supplied more than 300,000 Bartec standard and bridging couplers for the connection of two reinforcement bars. Bartec is simple to install and does not require professional skilled labor, which reduces labor on the job site, formwork costs, and increases job site safety.

Around 400,000 Bartec headed bars were also installed as a replacement for straight or hooked bars in concrete members and connections.

Moreover, the construction site used Unitec bolted couplers in repair works for the connection of two rebars which haven’t been previously prepared (that is, no threads).

The first stage of the system will open to the public in 2022, followed by a second stage in 2023.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.