Dextra’s Post Tensioning Bar Systems can be used for a variety of temporary and permanent construction applications. Typical permanent applications include the connection of girders and piers in segmental bridge construction. In the case of permanent applications, the systems is usually to be delivered with a full corrosion protection accessory system.
Dextra FT Bar systems are also frequently used on construction sites for temporary applications such as heavy lifting and stitching of precast elements and anchoring of steel frame supports.
Dextra PT range is divided in two major type of bars. This page focuses on the PT Bar systems using Fully Threaded Bar systems, which are usually cut to length as per project requirements, but may also be re-cut in shorter segments and re-used on the project site.
Bar system may be re-used,
shortened by cutting or extended
by couplers to fit new applications.
Dextra teams support the drafting
of your system
Full identification from drawing to
individual part labeling.
Tension Rods are aesthetic and highly-performing bar systems working in tension, usually for the cross-bracing of roof or façade structures.
Very high-tensile post-tensioning bar system based on smooth bars with cold-rolled threaded ends. Suits even the most demanding applications.
At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.
Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.
For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.
From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.
An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.
Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.
Share your information with us and we’ll get back to you as soon as possible.