مجموعة دكسترا | اتصالات موثوقة

يبحث
أغلق مربع البحث هذا.
يبحث
أغلق مربع البحث هذا.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

ال Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of سي آر بار 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

سونيتيك, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ مقرنات حديد التسليح

✅ GFRP Rebars

✅ قضبان التعادل البحرية

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

غير قادر على عرض ملف PDF. تحميل بدلاً من.

مارينا باي ساندز

مارينا باي ساندز

مارينا باي ساندز هو منتجع مذهل يضم أكثر من 2500 غرفة، وكازينو، والعديد من المطاعم، وتعلوه حديقة سماوية فريدة من نوعها. تم الانتهاء من المشروع وافتتاحه للجمهور في عام 2010.

بالنسبة لهذا المشروع، قامت Dextra بين عامي 2007 و2008 بتوفير حلول لربط التسليح، بالإضافة إلى أنابيب Sonitec.

تم استخدام قارنات التوصيل المصنوعة من حديد التسليح من Bartec في أسس جدران الحجاب الحاجز، مما يمثل استجابة لتحدي مزدوج.

يمكن استخدام قارنات حديد التسليح الأولى عموديًا لربط أقفاص الجدار D معًا، مما يسمح بتحقيق طول أطول للقفص.

ومن ثم يمكن أيضًا استخدام قارنات التوصيل أفقيًا كوصلات معلقة للألواح. في هذه الحالة، عادة ما يتم تثبيت قارنة التوصيل على قضبان خطافية ويتم صبها في الخرسانة. وفي مرحلة لاحقة، يمكن إعادة توصيل قارنة التوصيل بحديد التسليح في المرحلة الثانية لبدء تقوية البلاطة.

كما تم استخدام المقرنات للأنفاق تحت الأرض ومباني التهوية.

بالنسبة للأساسات، قامت Dextra أيضًا بتزويد أكثر من 100,000 متر طولي من أنابيب Sonitec، والتي يسهل تركيبها في أقفاص التسليح وإعادة توصيلها، مما يزيد من الإنتاجية ويزيل الحاجة إلى عمليات اللحام المملة وغير الموثوقة. بمجرد تركيبها، تكون الأنابيب ثابتة في مكانها، مما يدعم دون مشكلة رفع القفص والتعامل معه.

مطار دبي

مطار دبي

مطار دبي هو المطار الرئيسي في دولة الإمارات العربية المتحدة. المطار الشهير، الذي يقع على بعد بضعة كيلومترات شمال مدينة دبي، هو مقر شركة طيران الإمارات الشهيرة. مطار دبي الدولي هو المطار #1 في العالم من حيث حركة الركاب الدولية.

وقد شاركت شركة دكسترا الشرق الأوسط، التي تقع أيضًا في دبي، في العديد من مشاريع بناء مطار دبي، خاصة في الفترة من 2003 إلى 2005، لبناء المبنى رقم 3 والساحات المرتبطة به.

بالنسبة لمشروع دبي الداخلي، قامت شركة Dextra بتزويدها بمنتجاتها الشعبية
بارتيك حل قارنة التوصيل، حل قارنة حديد التسليح #1 في الإمارات العربية المتحدة. تم استخدام 1.5 مليون قارنة توصيل في مطار دبي الدولي.

البنية الفوقية

قدمت قارنات التوصيل من Bartec حلاً تقنيًا للسماح بإعادة توصيل تقوية المرحلة الثانية بين الأعمدة والكمرات، وبين الجدران والكمرات.

كما تم استخدام قارنات حديد التسليح أيضًا لإنشاء فتحات مؤقتة في التسليح، مما يسمح بمرور الأشخاص والمعدات.

أسس

تم استخدام قارنات التوصيل Bartec لأكوام الأساس. بالنسبة لهذا التطبيق، أصبحت القارنات جزءًا من عملية تصنيع القفص المتكاملة والمؤتمتة للغاية، مما يسمح بربط قضبان التسليح ذات القطر الكبير معًا في أقل وقت ممكن وزيادة إنتاج القفص إلى الحد الأقصى.

كمكمل لحل قارنة التوصيل لحديد التسليح من Bartec، تم استخدام أنابيب Dextra Sonitec لضمان التثبيت السريع وإعادة توصيل الأنابيب الصوتية على طول القفص. تتميز أنابيب Sonitec بسهولة تركيبها، وذلك بفضل فمها المطاطي Push-Fit، كما أنها سهلة التركيب في القفص بفضل رؤوسها الملحومة. تم تركيب أكثر من 1,800,000 متر من أنابيب سونيتيك في مطار دبي الدولي على مر السنين!

بانكوك BTS

بانكوك BTS

نظام النقل الجماعي في بانكوك (BTS) هو نظام قطار معلق حضري كبير يقع في جميع أنحاء بانكوك، عاصمة تايلاند. تم افتتاح النظام في عام 1999.

اعتبارًا من عام 2017، يتكون النظام من 24 محطة مرتفعة و37 كم من السكك الحديدية المرتفعة المنظمة في خطين رئيسيين يتقاطعان في محطة سيام المركزية.

ويشهد نظام BTS توسعة لخطيه الرئيسيين، ومن المتوقع أن تدخل قطاعات الخطوط والمحطات حيز التشغيل في عامي 2019 و2020.

أسس

بالنسبة للحزم المختلفة على مر السنين، قامت Dextra بتزويد أنابيب Sonitec، والتي تُستخدم لاختبار أساسات الأكوام الخرسانية أسفل المحطات والسكك الحديدية.

في المجمل، قامت Dextra بتزويد ما يقرب من 40,000 متر خطي من أنابيب Sonitec، وهي مسافة تعادل فعليًا طول نظام BTS نفسه.

أبراج

بالنسبة لوصلات القضبان العمودية، عرضت Dextra خدماتها
بارتيك اتصال.
بارتيك يسمح بربط أقفاص حديد التسليح الجاهزة بسهولة عن طريق استخدام قارنة توصيل حديد التسليح البسيطة، مما يسمح بتوفير الفولاذ مقارنة بالتداخل وتسريع عمليات الموقع.

في تايلاند، يتم دعم عملية الخيط من مصنع Dextra، الذي يقع في مكان مناسب في شمال شرق بانجوك. يتلقى المقاولون حديد التسليح المجهز بالفعل والمثبت باستخدام قارنة توصيل حديد التسليح الخاصة بهم.

AVE Palencia-Santander HSR الحزمة 1 (بالينسيا - بالنسيا نورتي) والحزمة 2 (بالينسيا نورتي - أموسكو)

يعد مشروع AVE Palencia-Santander للسكك الحديدية عالية السرعة مشروعًا مهمًا للبنية التحتية يهدف إلى ربط Palencia-Santander في إسبانيا. يتضمن هذا المشروع بناء شبكات سكك حديدية واسعة النطاق وجسور وجسور، مما يؤكد الحاجة إلى أساس قوي ومرن. وإدراكًا للأهمية الحاسمة لضمان السلامة الهيكلية للأكوام الخرسانية، سعت إدارة المشروع إلى استخدام منهجيات اختبار متقدمة.

لعبت Dextra دورًا محوريًا في ضمان متانة أساس المشروع من خلال توفير أنابيب اختبار Sonitec Crosshole Sonic Logging (CSL). لعبت هذه الأنابيب دورًا أساسيًا في إجراء اختبارات السلامة الهيكلية الشاملة على الأكوام الخرسانية لحزمة AVE Palencia-Santander USR Package 1 (Palencia – Palencia Norte) والحزمة 2 (Palencia Norte – Amusco).

Crosshole Sonic Logging هي طريقة اختبار غير مدمرة تستخدم على نطاق واسع لتقييم جودة وسلامة الأكوام الخرسانية. وهو ينطوي على استخدام الموجات الصوتية المنقولة عبر الخرسانة بين أنبوبي وصول، مما يسمح للمهندسين بتقييم خصائص المادة وتحديد العيوب المحتملة.

تم تصميم أنابيب Sonitec خصيصًا للتسجيل الصوتي عبر الفتحات، مما يضمن جمع بيانات دقيقة وموثوقة أثناء اختبارات السلامة الهيكلية. يتم دمج هذه الأنابيب في الأكوام الخرسانية أثناء البناء، مما يوفر نقاط وصول لنقل الموجات الصوتية.

الرجاء إدخال المعلومات الخاصة بك

اتصل بنا

   شارك معلوماتك معنا وسنقوم بالرد عليك في أقرب وقت ممكن.