مجموعة دكسترا | اتصالات موثوقة

يبحث
أغلق مربع البحث هذا.
يبحث
أغلق مربع البحث هذا.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of قضبان التعادل البحرية in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.

Dextra’s قضبان التعادل البحرية, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

دفع الاستدامة إلى الأمام: تقديم أدوات الحماية البيئية (EPDs) لقضبان الربط البحرية

 

نحن فخورون بالإعلان عن أحدث إضافة إلى رحلة الاستدامة لدينا: EPDs for Marine Tie Bars!

يتبع هذا الإنجاز خطواتنا في البناء الصديق للبيئة باستخدام EPDs (إقرارات المنتجات البيئية) لقارنات حديد التسليح وقضبان التسليح GFRP. يستمر التزامنا بينما نستعد لتقديم EPDs لأنظمة القضبان الهندسية الأخرى والحلول الإضافية. تابعونا بينما نواصل تمهيد الطريق لمستقبل أكثر اخضرارًا واستدامة في مجال البناء!

 

EPD Report for Dextra Marine Tie Bars

تقرير EPD لقضبان ربط Dextra Marine

غير قادر على عرض ملف PDF. تحميل بدلاً من.

الرجاء إدخال المعلومات الخاصة بك

اتصل بنا

   شارك معلوماتك معنا وسنقوم بالرد عليك في أقرب وقت ممكن.