خط مترو بروكسل 3

خط مترو بروكسل 3

Brussels Metro is a rapid transit system that serves a large portion of the Brussels, Capital Region of Belgium. It consists of 4 conventional metro lines and 3 pre-metro lines.

Line 3 is tram line that runs through the city center from Churchill in the south to Esplanade in the north, using the North-South Axis tunnel. The total route will be 10.3km long.

An 150m long new tunnel is being dug underneath the Brussels North railway station to connect two existing underground tunnels. It will be an important component of the new metro link.

Dextra supplied Sonitec, a tube solution invented to facilitate the integrity testing of foundations using the CSL testing method, to the construction site of Line 3. 13 kilometers of the tubes were installed in the 18m long pile cages.

Sonitec system have been designed for the sole purpose of facilitating the assembly and installation of long tube lengths in reinforcement cages.

Cairo Metro Line 4 – Phase 1

Cairo Metro Line 4 – Phase 1

The Cairo Metro is the rapid transit system in Greater Cairo, Egypt. It was the first of three full-fledged metro systems built in Africa, as well as the first in the Arab world. It began service in 1987 as Line 1 between Helwan and Ramsis Square, covering a distance of 29 kilometers.

The Cairo Metro currently has 74 stations, 3 of which are transfer stations, with a total length of 89.4 kilometers as of August 2020. There are three operating lines in the system, numbered from 1 to 3.

The new Line 4 will run from Makram Ebeid Station to Police Academy Station near the Ring Road, with bored tunnels following Doctor Hassan El-Sherif Street and Ahmed El-Zomor Street. It will be 24 kilometers long in total. Construction began in Q3 2019 and is expected to be completed in 2024.

Dextra has supplied 450,000 Bartec+ couplers and 42 GFRP soft-eyes for the reinforcement of the diaphragm walls.

Bartec+ is a mechanical splicing system with parallel threads for connecting concrete reinforcement bars with diameters ranging from 12 to 50 mm (ASTM #4 to #18). Its threaded bar end is tensile tested at 90% of the rebar yield strength.

Dextra’s GFRP soft-eye is an integrated turn-key solution that uses cut-able Glass Fiber Reinforced Polymer (GFRP) reinforcement as an alternative to traditional steel rebars, allowing the penetration of Tunnel Boring Machines (TBM) to pass through diaphragm walls with ease.

مترو لكناو – المرحلة الأولى

مترو لكناو – المرحلة الأولى

The Lucknow Metro project is built to serve growing population of Uttar Pradesh, North India, as well as to serve the areas that are not connected by the existing rail system. The 35-kilometer rail system comprises 22 stations, of which 19 will be elevated.
The first phase of the project consists in construction of 2 rail lines (North- South and East-West corridor), connecting four corners of Lucknow by running through the heart of the city. Being implemented by Lucknow Metro Rail Corporation (LMRC), the Phase 1 comprises the construction of 22.88-kilometer long North-South corridor. The priority section is 8.5 kilometers, linking Transport Nagar to Charbagh.
Once operational, the Lucknow Metro will help ease the traffic in the city, and will also reduce commuters’ travel time.

الاتحاد للقطارات

الاتحاد للقطارات

Etihad Rail is a 1,200-kilometer railway project that will be the first national freight and passenger railway network in the United Arab Emirates (UAE), connecting the seven emirates and promoting trade and social development in the Emirate and across the GCC countries.

The railway project is expected to be a sustainable alternative for freight and passenger transportation throughout the Emirate’s urban and rural areas. It is expected to carry approximately 16 million passengers and 50 million tons of cargo. It will make a significant contribution to lowering road traffic emissions.

The Etihad Rail network reaches the borders of Qatar and Saudi Arabia in the west. The western section connects to Saudi Arabia via Ghweifat, while the eastern section connects to Oman via Al Ain. The railway line connects Abu Dhabi, Sharjah, and Dubai and runs across the Emirate. Then it goes on to the northern emirates and Fujairah.

The rail network will be built in 3 stages. The first phase of the railway network, which opened in 2016, is a 266-kilometer-long western stretch between Al Ruwais and Shah. It connects Ruwais and Habshan, and then Habshan and Shah.

The second phase connects Abu Dhabi with Dubai. It is also linked to the ports of Jebel Ali, Musaffah, and Khalifa. The third phase entails connecting the northern Emirates. The second and third phases are scheduled for completion in 2024.

Dextra is currently supplying various engineered solutions for the second phase of rail network construction, which includes the construction of a 200km main line in Abu Dhabi and a 40km branch line to Khalifa port, a 78km main line in Dubai and a 20km branch line to Jebel Ali port, a 98km main line from Sharjah to Fujairah and a 29km branch line to Tawyeen, as well as associated facilities.

These solutions were delivered to the railway tunnel construction site.

  • 110,000 Bartec couplers for concrete structure reinforcement.
  • 32,000 Sonitec tubes for the CSL (crosshole sonic logging) testing of foundation piles.
  • 69,000 steel rock-bolts for stabilizing rock excavations.
  • 400 GFRP (Glass Fiber Reinforced Polymer) rock-bolts.
  • 660 umbrella pipes for stabilizing tunnel headings.
  • Source of top image: https://filipinotimes.net/news/2019/12/19/coming-soon-rail-network-linking-dubai-fujairah-khorffakan-ports/

    خط النقل بالسكك الحديدية الخفيفة 3

    خط النقل بالسكك الحديدية الخفيفة 3

    The 37km-long Light Rail Transit Line 3 (LRT3) is a light rail line under development in Malaysia. It includes a 35km viaduct and a 2km underground tunnel and it will link Bandar Utama with Johan Setia in Klang.

    Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will play a strategic part in extending rail connectivity to the Western Corridor of GKL/KV.

    Dextra provided cuttable Glass Fiber Reinforced Polymer (GFRP) soft-eye solutions installed in diaphragm walls of escape shafts, in order to facilitate the underground tunnel breakthrough by Tunnel Boring Machines (TBM).

    The LRT3 project is expected to serve 2-million people across the alignment by improving connectivity, alleviating traffic congestion and stimulating economic growth along the Western Corridor of Klang Valley, from Klang to Petaling Jaya.

    The construction is scheduled for completion by February 2024.

    خط مترو بنما 3

    خط مترو بنما 3

    Panama Metro Line 3 is a 34km-long monorail line being developed as part of the Panama metro project. It will be the largest project in the country since the expansion of the Panama Canal.

    The line will establish a connection between the province of Panama Oeste and the province of Panama, reducing the average travel time by half, from 90 minutes to 45 minutes. The monorail system will be the first to use Japanese technology in the Americas.

    Dextra supplied 260,000 Bartec couplers for the elevated monorail structure’s piling column and precast beam connection.

    Sonitec tubes were also used to examine the structural integrity of concrete using the crosshole sonic logging testing method.

    Expected to begin operations in mid-2025, the line will benefit more than 500,000 residents of the Panama Oeste province.

    Image credit: Línea 3 del Metro de Panamá YouTube Channel, www.elmetrodepanama.com

    مترو ليما

    مترو ليما

    مترو ليما هو نظام نقل سريع في بيرو، ويربط حاليًا منطقة فيلا السلفادور في جنوب ليما مع سان خوان دي لوريجانتشو، في المنطقة الشمالية الشرقية من المدينة. بدأ خط المترو 1 تشغيله في عام 2011 بـ 26 محطة، بإجمالي طول 34.6 كيلومترًا، وهو أطول خط مترو في الأمريكتين.

    تشارك دكسترا في بناء خط المترو 2 والمرحلة الأولى من الخط 4 التي بدأت في وقت واحد في عام 2016. الخط 2 هو خط مترو أنفاق بطول 27 كيلومترًا، يربط منطقة آتي (ليما) ومنطقة كالاو المجاورة للعاصمة. الخط 4 هو جزء بطول 8 كيلومترات سيربط الخط 2 بمحطة مطار خورخي شافيز الدولي.

    تم توفير أكثر من 160,000 قارنة من حديد التسليح من شركة Rolltec إلى موقع بناء المترو لتجنب ازدحام حديد التسليح بالطريقة التقليدية المتداخلة.

    تم تركيب عدة أنواع من قارنات التوصيل Rolltec في أجزاء مختلفة من هياكل المحطات، بما في ذلك قارنات التوصيل القياسية بحجم #8 و#11 و#14، وقارنات التوصيل الانتقالية بحجم #8 و#11.

    سيتم تشغيل الخط الكامل في عام 2024.

    نقل أعمال معالجة مياه الصرف الصحي في شا تين إلى الكهوف

    نقل أعمال معالجة مياه الصرف الصحي في شا تين إلى الكهوف

    The Sha Tin Sewage Treatment Works Relocation project is a project to relocate the Sha Tin Sewage Treatment Works (STW) in Sha Tin, Hong Kong, which is currently located at the mouth of the Shing Mun River, to the cavern site at Nui Po Shan of A Kung Kok on the opposite bank, freeing up the existing site for uses beneficial to people’s livelihood and improving the local living environment.

    The future Sha Tin Cavern STW will be the largest of its kind in Hong Kong, occupying 14 hectares of land. It will have the same treatment capacity as the current one, but will use advanced sewage treatment technology to meet local population demands and improve services for residents.

    For the tunneling works, Dextra has supplied around 800 pieces of GEOTEC™ GFRP rock-bolts for the tunnel’s temporary supporting.

    GEOTEC™ GFRP rock-bolts are made of cut-able glass fiber reinforced polymers, making them perfect for face bolting or any other tunneling and mining application where further excavation is required.

    Source of images: https://ststwincaverns.hk/

    خط دائرة سنغافورة (CCL) – المرحلة 6

    خط دائرة سنغافورة (CCL) – المرحلة 6

    خط الدائرة (CCL) هو خط نقل سريع جماعي تحت الأرض في سنغافورة. يمتد الخط الذي يبلغ طوله 35 كيلومترًا و30 محطة من Dhoby Gaut وMarina Bay في المنطقة الوسطى إلى HarbourFront في الجنوب.

    إنه أحد أطول خطوط النقل السريع بدون سائق في العالم.

    في عام 2013، تم الإعلان عن المرحلة السادسة من خط سيركل لاين، وهي امتداد بطول 4 كم لإغلاق دائرة CCL أخيرًا عن طريق ربط محطة HarbourFront بمحطة Marina Bay.

    وهناك ثلاث محطات إضافية قيد الإنشاء ومن المتوقع أن يتم تشغيلها في عام 2025.

    كانت الخبرة والجودة المعروفة في حلول تقوية الخرسانة ضرورية للتعامل مع هذا المشروع، وتم اختيار قارنات Dextra's Bartec لعدة أجزاء من هيكل Circle Line، بما في ذلك قضبان البداية والألواح ومفاصل الأعمدة.

    وبحلول نهاية المشروع، سيتم تسليم ما يقرب من 200.000 قارنة توصيل في الموقع.

    علاوة على ذلك، قدمت دكسترا 3000 متر من قضبان التسليح المصنوعة من البوليمر المقوى بالألياف الزجاجية (GFRP)، والتي يمكن أن تتميز ببعض الفوائد الرئيسية فيما يتعلق بقضبان التسليح المعدنية: وزن أخف، وعدم وجود خطر للتآكل، وقابلية أقل لجذب ضربات البرق.

    علاوة على ذلك، تم تكليف شركة Dextra بتعزيز الهيكل الخرساني للأنفاق: تم استخدام 8 عيون ناعمة من Astec لتسهيل اختراق آلات حفر الأنفاق (TBM) من خلال جدران الحجاب الحاجز، وذلك بفضل هيكل GFRP المبتكر القابل للقطع.

    فورست سيتي جوهور 森林城市

    فورست سيتي جوهور 森林城市

    فورست سيتي هو مشروع حضري ضخم متعدد الاستخدامات يقع في الطرف الجنوبي لماليزيا، في منطقة إسكندر، جوهور. يجري التطوير على أرض مستصلحة عبر طريق جوهور المستقيم، على مرأى من سنغافورة.

    ويهدف المشروع، الذي سيستمر على مدى العقد المقبل، في نهاية المطاف إلى إنشاء 300 ألف وحدة سكنية تستوعب ما يصل إلى 700 ألف شخص، بالإضافة إلى العديد من المباني التجارية.

    ومن المتوقع أن يعمل مشروع فورست سيتي على تغذية اقتصاد المنطقة، وكذلك اقتصاد سنغافورة، حيث ستؤدي خطوط السكك الحديدية الخفيفة والطرق في نهاية المطاف إلى الربط عبر المضيق مع الدولة الجزيرة.

    وقد شاركت Dextra منذ المراحل الأولى للمشروع في توريد منتجاتها جروتيك إس الحل الجاهزة. يسمح Groutec بالاتصال السريع للأعمدة والألواح مسبقة الصب، دون الحاجة إلى وصلات في الموقع، مما يؤدي إلى تسريع مشروع البناء. لمشروع مدينة الغابات، Groutec س تم استخدام المقرنات (النماذج المدمجة) لربط الألواح مما يجعل جدران القص للأبراج السكنية.

    يتم دعم مشروع Forest City من خلال تركيب عدة مجموعات من معدات الخيوط من Bartec في الموقع، والتي تقوم بإعداد القضبان بالخيوط من أجل إجراء الاتصال بالجزء العلوي من جلبة Groutec. كما قدم فريق خدمات ما بعد البيع في Dextra التدريب والدعم لضمان مستويات إنتاج عالية طوال مدة المشروع.

    لمزيد من المعلومات حول مدى توفر الحلول الجاهزة في آسيا، يرجى الاتصال بنا مكتب بانكوك