مجموعة دكسترا | اتصالات موثوقة

يبحث
أغلق مربع البحث هذا.
يبحث
أغلق مربع البحث هذا.

أطول برج مسبق الصب في الهند

أطول برج مسبق الصب في الهند

Galaxy Towers, developed by Aurobindo, is a project to construct 24-storey precast office building in Hyderabad, India.

It will be the tallest office tower in India built with precast technology.

The building comprises of 4 basement floors and 24 upper stories with 1.9 million sq. ft. leasable area, which will include health clubs, food courts, cafés, a business center, ample car parking and a waiting lounge.

The project is expected to be built in half the time of a comparable conventional cast-in-situ construction, illustrating how the precast technology has gained ground thanks to its efficiency.

For this special project, Dextra supplied a critical part of the precast structure: Groutec coupler, a half-grouted sleeve designed for the connection of precast elements and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, AASHTO & IS 16172.

By installing Groutec couplers into the precast columns and walls at the precast factory, the fast and safe connection of walls or columns is achieved by injecting cementitious non-shrink grout through the inlet into the sleeves at site. 102,000 Groutec couplers have been delivered for this project.

The Galaxy Towers is anticipated to be completed in 2020.

(photo credit: Aurobindo Realty & Infrastructure Private Limited at https://bit.ly/37DW7IT)

مدينة الملك سلمان للطاقة (سبارك)

مدينة الملك سلمان للطاقة (سبارك)

مدينة الملك سلمان للطاقة (سبارك) هي مشروع مدينة صناعية جديدة يجري بناؤها وتقع بين الدمام والأحساء في المنطقة الشرقية من المملكة العربية السعودية.

ويهدف المشروع إلى الاستجابة للطلب المتزايد باستمرار على المنتجات والخدمات المتعلقة بالطاقة في البلاد، بما في ذلك التنقيب والإنتاج والتكرير والبتروكيماويات والطاقة التقليدية وإنتاج المياه ومعالجتها والحفر.

ومع الانتهاء من المرحلة الأولى في عام 2021، سيتم تقسيم سبارك إلى 5 مناطق رئيسية هي المنطقة الصناعية والميناء الجاف والمنطقة اللوجستية ومنطقة الأعمال ومراكز التدريب والمجمعات السكنية والأنشطة التجارية.

قامت شركة Dextra بتوريد حوالي 700,000 من قضبان التسليح ASTEC GFRP (البوليمر المقوى بالألياف الزجاجية)، طراز GR45P ذات الشكل المستقيم والمنحنٍ، للمباني والأرصفة.

يوفر حديد التسليح ASTEC GFRP GR45P مرونة معامل عند 45 جيجا باسكال وقوة شد وفقًا لمعيار ASTM 7205 - 06. ويمكن استخدامه كمواد تقوية لكل من الإنشاءات الجديدة والحالية.

وعند الانتهاء المتوقع من المرحلة الثالثة في عام 2035، ستشغل مساحة 50 كيلومترًا مربعًا ومن المتوقع أن تخلق 100 ألف فرصة عمل.

زعبيل واحد

زعبيل واحد

يُعد "ون زعبيل" من إثراء دبي مشروعًا تطويريًا مبدعًا سيضع معايير جديدة ويدفع حدود التصميم والهندسة في دبي من خلال "The Link"، وهو أكبر ناتئ في العالم يشرح المبنيين ويوفر إطلالات 360 درجة على المدينة.

يشتمل المشروع الشاهق متعدد الاستخدامات على مساكن فاخرة، وفندق فخم للغاية، وشقق فندقية، ومساحات مكتبية متميزة، ومنصة للبيع بالتجزئة، وبهو بانورامي.

قامت Dextra بتسليم أكثر من 400,000 وحدة من قارنات التوصيل القياسية لحديد التسليح من Bartec لتوصيل الأطواف والأعمدة والألواح بالجدران الأساسية، بالإضافة إلى الفتحات المؤقتة وقضبان البدء.

يتم أيضًا تركيب قارنات التوصيل القابلة للحام من Bartec لتوصيل الهياكل الخرسانية الكابولية.

وتتوقع إثراء دبي الانتهاء من أعمال الكسوة الكاملة للبرج A والبرج B وThe Link بحلول نهاية عام 2021، وبالتالي استكمال الأعمال الخارجية في One Za'abeel. سيتم بعد ذلك استئناف أعمال البناء والتركيب الداخلي بتركيز أكبر.

مصدر الصور: https://gulfbusiness.com/work-progresses-on-one-zaabeel-project-in-dubai-with-tower-b-topped-out/، https://www.cbnme.com/news /ithra-dubais-one-zaabeel-the-link-lifted-to-its-final-position-100-meters-above-ground-level/، https://alemco.ae/projects-archive/one-zaabeel/ , https://alec.ae/portfolio-item/one-zaabeel/, https://gulfnews.com/photos/business/another-milestone-with-the-link-now-lifted-at-iconic-one- زعبيل-100-متر-فوق سطح الأرض-1.1599134222596 ?slide=1

مفتاح راما 3

مفتاح راما 3

The Key Rama 3 is a 484-unit high-rise condominium by Land & Houses with sizes ranging from 29 to 61 square meters. The project is located near the Chaopraya river on Rama 3 road, approximately 12 km. from Charoen Krung intersection to Na Ranong junction at Klongtoey in Bangkok, Thailand.

The condominium is a fully precast concrete building with no cast-in-place concrete on its main structural elements.

This type of construction required less workers, materials like rebars, and concrete on the site, which resulted in a shorter construction period and fewer complaints from the neighboring community regarding noise and waste.

Grouted mechanical sleeves were used to join the precast elements, and Dextra Groutec couplers, installed inside shear wall and bearing wall, were an important part of the process.

“The half-grouted mechanism of Groutec L and S sleeves, which have a threaded end on one side, ensured accuracy and reduced mistakes during the grouting process” said Mr. Janeboon Leepipatnavit, Project Director of Taveeporn Technology Co., Ltd., the contractor of this project.

Mr. Janeboon further stated that Dextra was a reliable company with its own facilities in Thailand that could provide immediate support if required.

مدينة زاخر

مدينة زاخر

مدينة زاخر هي واحدة من أكبر المشاريع العقارية في مكة المكرمة بالمملكة العربية السعودية. يتكون هذا المشروع المختلط من فنادق من فئة ثلاث إلى أربع نجوم وأبراج سكنية بالإضافة إلى الأسواق والمراكز الصحية ومراكز الشرطة والإطفاء. وهي مصممة لاستيعاب أكثر من 200000 شخص.

نظرًا لأن موقع البناء يقع في منطقة جبلية، فقد كان نظام التثبيت ضروريًا لتأمين الكتلة الصخرية السائبة التي تكونت بعد الحفر. قامت شركة Dextra بتسليم ما يقرب من 3000 من البراغي الصخرية الفولاذية الملولبة بالكامل لتحقيق الاستقرار في الموقع.

تعمل البراغي الصخرية عن طريق حياكة طبقات الصخور غير المستقرة معًا قبل أن تتمكن من التحرك بدرجة كافية لتسبب الفشل. توفر Dextra مسامير صخرية FRP فولاذية وقابلة للقطع لربط الوجه أو أي تطبيق آخر لحفر الأنفاق/التعدين.

وقد شاركت Dextra منذ المراحل الأولى لهذا المشروع في توفير منتجات عالية الجودة ودعم احترافي في موقع البناء.

البرج ذو التصميم المتقاطع الشهير في قطر

البرج ذو التصميم المتقاطع الشهير في قطر

بفضل تصميمها المعماري الفريد المستوحى من السيوف المعقوفة المتقاطعة لختم البلاد، من المقرر أن تصبح أبراج كتارا معلم الضيافة المستقبلي في الدوحة، قطر.

وسيتكون هذان البرجان المقوسان المكونان من 36 طابقا من فندق فخم من فئة خمس نجوم، وأول فندق من فئة ستة نجوم في البلاد، ومساكن خاصة.

وستكمل جزيرة صناعية على شاطئ البحر القمر الصناعي المشروع، حيث تضم مرافق ترفيهية وترفيهية فاخرة.

بالنسبة لهذا المشروع المميز، تم تكليف شركة Dextra بتعزيز الهياكل الخرسانية باستخدام 300000 قارنة من حديد التسليح من Bartec.

تم تطبيق القارنات داخل الأساسات والأعمدة والجدران الأساسية لربط قضبان التسليح بأقطار مختلفة بسرعة.

Bartec عبارة عن قارنة توصيل لقضبان التسليح ذات سن متوازي تربط بين قضيبين في عملية مكونة من 3 خطوات، بما في ذلك تكبير القضيب بالتشكيل على البارد قبل اللولبة.

تضمن هذه العملية الحاصلة على براءة اختراع قوة شد عالية جدًا وأداءً يكسر القضبان.

ومن المتوقع الانتهاء من البرج في عام 2021، ليصبح نقطة محورية للمسافرين خلال كأس العالم لكرة القدم 2022.

(مصدر الصورة: ProTenders على https://www.protenders.com/en/projects/katara-towers)

مجال MSG

مجال MSG

MSG Sphere is an under-construction music and entertainment venue being built in Paradise, Nevada, near Las Vegas Strip. The sphere-shaped venue will have a capacity of 18,000 and will feature LED screens inside and outside of the venue.

The equipped indoor spherical digital display panel will spread across the interior of the venue while an outdoor screen display will show what is going on inside. The venue will be built along with new bars, private suites, a museum and retail space.

The 360-feet tall and 516-feet wide sphere is being built on 18 acres off Sands Avenue between Manhattan Street and Koval Lane. Dextra rebar couplers and headed bars have been used to connect and reinforce columns, core walls and beams of the building’s structure.

Dextra’s Bartec rebar couplers are designed to splice either the same or different diameter bars, whether one bar can be rotated, or not. Bartec spliced bars provide full strength in tension, compression and stress reversal applications. The mechanical splicing solution is accredited by major independent regulatory bodies; for example, the American Society of Mechanical Engineers, UK CARES and Bureau Veritas.

Headed bars are also used to replace hooked bars as end anchorages in congested areas to reduce lapping length for beam-column connections. Standard Bartec mechanical anchorages are circular in shape and are attached by threading onto the rebar.

The construction of MSG Sphere is projected to be completed in 2021.

Sources of images: https://www.fox5vegas.com/news/local/msg-sphere-at-the-venetian-on-track-to-open-in-2021/article_341b5314-ada6-11e9-8bb9-635fb1d12606.html, https://www.reviewjournal.com/business/tourism/msg-sphere-venue-in-las-vegas-moving-forward-with-contractor-1678356/, https://www.reviewjournal.com/?p=2185035?fbclid=IwAR3YwCkehFu8K3luckjLtBg_KObUBrUYt4pBEihylkhDfSNUoENQXMAJDTw

وان بانكوك - منطقة متكاملة متعددة الاستخدامات

وان بانكوك - منطقة متكاملة متعددة الاستخدامات

One Bangkok هو مشروع تطوير حضري جديد في وسط بانكوك. وسيشمل هذا المشروع متعدد الاستخدامات مكاتب، ومساحات للبيع بالتجزئة، وفنادق فاخرة، ومساكن، ومساحات ثقافية واجتماعية، بمساحة أرضية إجمالية تبلغ 1.83 مليون متر مربع. سيكون أبرز ما في الموقع هو البرج المميز الذي يبلغ طوله 430 مترًا والمكون من 90 طابقًا.

في فبراير 2020، أكملت شركة One Bangkok, Co., Ltd، جنبًا إلى جنب مع شركة CPAC Co., Ltd. والشركاء: KCS & Associates Co., Ltd.، وStonehenge Inter Plc، وشركة Italian-Thai Development Corporation Limited، أكبر عملية صب خرسانة مستمرة في جنوب شرق آسيا لوضع الأساس لأحد أبراج المكاتب الأولى.

استغرقت العملية برمتها 33 ساعة و15 دقيقة، وتم التنسيق الناجح لـ 547 شاحنة قدمت إجمالي 23,725 مترًا مكعبًا من الخرسانة.

كانت شركة Dextra وراء توصيل 2,200 طن من أساسات حصيرة التسليح الفولاذية من خلال توريد 500,000 وحدة من قارنات التوصيل القياسية Bartec، وقارنات التوصيل الانتقالية، والقضبان الرأسية.

تم تطبيق قارنات التوصيل القياسية والانتقالية من Bartec على العديد من التطبيقات التي تتطلب ربط قضبان التسليح، على سبيل المثال، اتصالات العمود بعمود والعارضة بالعمود.

تسمح قارنات التوصيل الانتقالية بربط قضيبين من أحجام مختلفة.

تم استخدام القضبان ذات الرأس كمسمار تثبيت لربط الأعمدة بالأساسات الخرسانية المسلحة. هذا الحل يخفف بشكل كبير من احتقان حديد التسليح:

Headed Bars as anchor bolts

مرسى الأساس الخرساني: القضبان المنحنية مقابل القضبان الرأسية

عند اكتماله في عام 2023، سيكون One Bangkok وجهة عالمية بارزة جديدة في قلب المدينة.

أماريليس – شقق فاخرة

أماريليس – شقق فاخرة

أماريليس هو مشروع سكني فاخر مع وسائل الراحة الحديثة يقع في منطقة متميزة في نيودلهي، بالقرب من مناطق الجذب الرئيسية في المدينة مثل كونوت بليس، بوابة الهند، المطار، راشتراباتي بهوان وغيرها، مما يجعله لا يقاوم لمشتري المنازل.

كان الالتزام بإكمال المشروع في الوقت المحدد هو جوهر هذا المشروع المميز. ونتيجة لذلك، كان العميل يتطلع إلى الشراكة مع وكالة قارنات موثوقة للغاية تتمتع بخبرة في تنفيذ مشاريع عالية السرعة مع تقديم منتج عالي الجودة في الوقت المحدد.

ومن ثم، فإن Dextra، الحائزة على شهادة ISO 9001: 2015 من BureauVeritas، هي إحدى الشركات الرائدة في السوق في مجال أعمال قارنات التوصيل، حيث شاركت في أكثر من 15000 مشروع بناء أو صناعي رئيسي في جميع أنحاء العالم وتوفر تجربة وخبرة عالمية فريدة.

تم تسليم ما يقرب من مليون قطعة من قارنات التوصيل من Bartec إلى موقع البناء لتوصيل قضبان التسليح Fe500D وFe550D وFe600.

نظرًا لأن المشروع كان لديه جدول زمني ومتطلبات تسليم صارمة، كان من الأهمية بمكان التأكد من أنه ليس فقط تم شراء قارنات التوصيل من Dextra وتسليمها في الموقع ضمن الجدول الزمني المحدد للتسليم، ولكن أيضًا أن معدات الخيوط المثبتة يمكن أن تلبي ما متوسطه 4000-6000 مواضيع جاهزة يوميا.

علاوة على ذلك، كانت المعايير الرئيسية للخيوط هي استخدام أقل قدر ممكن من المعدات بسبب قيود المساحة وتحقيق النتائج المستهدفة. مع وجود 3 أبراج مختلفة الحجم متصلة بواسطة ممشى طويل، كان هناك قدر متساوٍ من الضغط على متطلبات قضبان التسليح الملولبة لاستيعاب كل برج في نفس الوقت.

قامت Dextra أيضًا بتزويد Sonitec، وهو حل أنبوبي سهل التجميع وموفر للوقت، لاختبار CSL (التسجيل الصوتي عبر الفتحات) لأكوام الأساس.

أرسل فريق Dextra في الهند فريقًا من الخبراء من المشرفين والمشغلين إلى الموقع للتأكد من أن خيوط حديد التسليح وإمدادات قارنة التوصيل تعملان جنبًا إلى جنب. ومع التركيز القوي على رضا العملاء، تم ترتيب جميع الموارد وفقًا لمواصفات العميل لضمان عدم وجود أي تأخير.

لقد كان هدفنا دائمًا هو تقديم منتج عالي الجودة للعميل، لذلك تم دائمًا استيفاء جميع متطلبات اختبار الجودة والإجراءات والشهادات. كما قام فريق الصيانة المجهز جيدًا لدينا بوضع الضمانات والأحكام اللازمة لتجنب تعطل الماكينة.

مصدر الصور: https://www.theamaryllis.in/

توسعة أعمال معالجة مياه الصرف الصحي في شا تاو كوك المرحلة الأولى

توسعة أعمال معالجة مياه الصرف الصحي في شا تاو كوك المرحلة الأولى

The Sha Tau Kok Sewage Treatment Works Phase 1 Expansion project stands as a testament to Hong Kong’s commitment to environmental sustainability and efficient wastewater management. It aims to increase the treatment capacity, ensuring that the city’s sewage is processed efficiently and in an environmentally responsible manner. A remarkable feature of this expansion is the use of Groutec S couplers to seamlessly link precast columns of the building.

Groutec is designed for the efficient and easy installation of precast concrete elements, reducing construction time and labor costs while providing full structural connection. For this project, Groutec S diameter 32mm precast couplers have been used to connect precast columns in vertical applications. The Groutec coupler is installed in the bottom element, and then grout is poured by gravity directly into the coupler cavity. This process ensures the structural integrity and longevity of the facility.

الرجاء إدخال المعلومات الخاصة بك

اتصل بنا

   شارك معلوماتك معنا وسنقوم بالرد عليك في أقرب وقت ممكن.