مجموعة دكسترا | اتصالات موثوقة

يبحث
أغلق مربع البحث هذا.
يبحث
أغلق مربع البحث هذا.

سي وورلد أبوظبي

سي وورلد أبوظبي

SeaWorld Abu Dhabi is an under-construction marine life theme park and animal research, rescue and rehabilitation center, planned to open in 2023 on Yas Island in Abu Dhabi, United Arab Emirates.

It will be the first SeaWorld park outside of the US, under a license from SeaWorld Parks & Entertainment. The Abu Dhabi-based company Miral is the owner and operator of the project.

Dextra have supplied 400,000 Bartec couplers for the connection and reinforcement of columns, beams, and slabs.

Moreover, 20,000 linear meters of cuttable GFRP (Glass Fiber Reinforcement Polymer) rebar have also been installed in the overlay slabs of the swimming pools, replacing steel rebars as the product of choice.

Thanks to its durability and corrosion-free nature, GFRP is an ideal material when the concrete structure is surrounded by water.

Dextra GFRP Rebar

Source of images: https://www.constructionweekonline.com/projects-and-tenders/267779-construction-of-mirals-seaworld-abu-dhabi-hits-40-milestone, https://www.thenationalnews.com/lifestyle/things-to-do/2023/05/22/seaworld-abu-dhabi-opens-with-star-studded-event/

ون سيتي سنتر (OCC)

ون سيتي سنتر (OCC)

One City Center (OCC) هو مشروع مبنى مكاتب مكون من 61 طابقًا في قلب بانكوك، تايلاند.

يتم تنظيم المبنى من كتلتين - النواة الأنيقة في الغرب ومساحة المكاتب الزجاجية في الشرق. يتم تعريف البرج من خلال تقاطع هذين المجلدين وملفوفًا بالنظام الهيكلي القطري الذي يغلف القلب.

تم تركيب 150,000 قارنة من حديد التسليح من Bartec و20,000 قضيب رأسي في البنية التحتية والبنية الفوقية تحت الأرض على النحو التالي.

البنية التحتية تحت الأرض:

  • المطبقة في جدران الحجاب الحاجز.
  • لتعزيز حديد التسليح في الأساس حصيرة.
  • لتبسيط البناء من أعلى إلى أسفل عملية.
  • لتسهيل مرحلة صب الخرسانة لأساس الحصيرة (قضبان الرأس).
  • البنية الفوقية:

  • تطبق في الجدران الأساسية.
  • تستخدم ك وتد لقضبان البداية.
  • لتوصيل الأعمدة و الأعمدة إلى الحزم.
  • لتسهيل أعمال البناء في فتحات مؤقتة.
  • ومن المقرر الانتهاء من المشروع في الربع الأخير من عام 2022.

    مصدر الصور: https://www.facebook.com/onecitycentrebangkok/

    تطوير محطة كهرباء باترسي: إعادة إحياء أحد معالم المملكة المتحدة

    Battersea Power Station Development:

    The Revitalization of a UK Landmark

    Battersea Power Station was a decommissioned coal-fired power station, located on the south bank of the River Thames, in Nine Elms, Battersea, in the London Borough of Wandsworth.

    The power station was one of the world’s largest brick buildings and one of the last major symbols of London’s industrial past.

    After the building remained empty for almost 40 years, a redevelopment plan kicked off with the mission to build a new iconic London landmark.

    The 3rd phase consists in the creation of the so-called ‘Electric Boulevard’, which will include a connection to the Northern Line Extension station, more than 1,300 residential units, a 160-room hotel, retail spaces, restaurants and leisure facilities.

    Dextra has been supplying several rebar coupler solutions to the site.

    More than 100,000 Griptec and Rolltec cast-in-situ couplers were applied in masonry cells to alleviate the problem of rebar congestion due to long lap length.

    Moreover, precast concrete panels reinforced by rebars were used in the building, equipped with 30,000 Groutec couplers for onsite connection of continuation bars.

    The panels were easily lifted into place at the construction site: coupler cavities were then filled with non-shrink grouting mortar through the injection holes.

    Finally, 3,000 Unitec bolted couplers were installed on rebars for repair works. These couplers were used to replace the damaged reinforcements with new ones and to connect to the finished structure.

    The mixed-use community is anticipated to be completed in 2020 and to become a new landmark for locals, tourists and residents.

    رابط لا ديفانس

    رابط لا ديفانس

    The Link is a 242-meter-high skyscraper in France, and one of the most recognizable structures in the heart of Europe’s largest business district. The building, located in Paris La Défense, will be the tallest high-rise in the country and a prime example of innovative engineering and cutting-edge technology in the world of architecture.

    One of the key factors that sets this building apart from others is the use of Dextra’s Fortec coupler for the reinforcement of its structure. Fortec coupler is a highly advanced and innovative solution for reinforcing concrete structures, and it was used throughout the building to ensure maximum strength and stability.

    The building is being constructed with a focus on sustainability and durability. The use of Fortec coupler was an important part of this effort, as it provides a reliable and long-lasting solution for reinforcing concrete structures. The coupler is made of high-strength steel, which makes it extremely durable and able to withstand the harsh weather conditions in the La Défense area.

    Fortec coupler also offers a number of benefits over traditional reinforcement methods. For example, it is faster and easier to install than traditional reinforcement methods, which helps to reduce construction time and costs. It also helps to maintain the structure’s integrity even in the event of an earthquake or other natural disaster.

    The Link La Défense building is set to be a marvel of modern engineering, and the use of Fortec coupler is a critical component in its design. The coupler’s durability, reliability, and sustainability will ensure that the building remains a prominent structure in the La Défense area for many years to come.

    Image credit: www.skyscrapercity.com, thelink-ladefense.com, The Link © PCA-Stream

    متحف غوغنهايم

    متحف غوغنهايم

    Guggenheim Abu Dhabi is a museum of modern and contemporary art, located in Saadiyat Island cultural district in Abu Dhabi, United Arab Emirates. As this awe-inspiring museum took shape, numerous challenges needed to be overcome, and Dextra provided crucial reinforcements to the structure, ensuring its stability, durability, and overall success. We supplied an astounding 140,000 Bartec couplers, 30,000 RepairGrip couplers, 50 tons of Geotec rock bolts, and 199 sets of DCP anchors, contributing significantly to the construction of this iconic masterpiece.

    Strengthening the Structure with Bartec Couplers:

    The Guggenheim Abu Dhabi stands tall and proud, thanks to the reinforcement provided by Dextra’s Bartec couplers. With a supply of 140,000 Bartec couplers, Dextra ensured that the concrete reinforcement in the structure remained robust and resilient. These couplers provide a reliable mechanical connection between reinforcing bars, enhancing the overall strength of the structure.

    Seamless Rebar Connection with RepairGrip Couplers:

    The use of 30,000 RepairGrip couplers helps connect rebars with no prepared threads, ensuring a seamless connection of rebars and minimizing the risk of structural failure.

    Stabilizing Rocks with Geotec Rock Bolts:

    In addition to the couplers, Dextra provided 50 tons of Geotec rock bolts to stabilize the rocks surrounding the museum. These rock bolts serve as critical anchors, reinforcing the natural formations and enhancing their stability. By utilizing them, the construction team effectively mitigated the geological risks associated with the site, ensuring a secure foundation for the museum.

    Retaining the Seawall with DCP Anchors:

    The museum, standing gracefully on the shores, required robust seawall retention, and Dextra’s DCP anchors provided the ideal solution. With the supply of 199 sets of DCP anchors, the seawall was reinforced and secured effectively. The anchors offer reliable and efficient retaining solutions for coastal structures, providing stability in the face of dynamic forces such as waves and tides.

    Upon completion, it is planned to be the largest of the Guggenheim museums.

    خزانات قطر الكبرى

    خزانات قطر الكبرى

    Qatar’s General Electricity & Water Corporation (KAHRAMAA) is currently building fresh water reservoirs to store the equivalent of 7 days of Qatar’s national consumption of fresh water at WHO (World Health Organization) standards. The primary reservoirs are located in five different sites in Doha area: Um Baraka, Um Salal, Rawdat Rashid, Abu Nakhla, and Al Thumama.

    The first phase of the project involves the construction of 5 mega reservoir sites, and will support the expected water demand at horizon 2026. The second phase includes the construction of 16 additional reservoirs within the five existing mega sites. With a capacity of 3.5 million m3 each, the Reservoirs are among the largest of their kind in the world.

    For this project, Dextra Middle East delivered more than 3 million بارتيك couplers to the rebar fabricators and contractors involved on the different packages.

    Project requirements regarding corrosion protection specify that the complete reinforcement, including couplers, should be epoxy coated. Dextra is therefore delivering all Bartec couplers with epoxy coating, giving them a distinctive green look.

    qatar-reservoir-epoxy-bartec

    Couplers are used in the raft and columns all over the different reservoirs as a way to reduce steel congestion and generate savings.

    For more information about Dextra solutions and project in the Middle East, please contact our Dubai office.

    بانكوك أرينا

    بانكوك أرينا

    بانكوك أرينا هي ساحة داخلية متعددة الرياضات تقع في منطقة نونج تشوك شرق بانكوك. تم تكليف الساحة باستضافة بطولات كرة الصالات، وهي نسخة داخلية من كرة القدم. في الوقت الحاضر تستضيف الساحة أيضًا أحداث الكرة الطائرة وكرة السلة بالإضافة إلى الحفلات الموسيقية. يمكن للساحة أن تستوعب ما يصل إلى 12000 شخص.

    قامت شركة Dextra بتصميم وتوريد هذا المشروع في عام 2012 قضبان التوتر تعليق سقف المبنى.

    يتم تثبيت أنظمة القضبان المعمارية الطويلة على أبراج خرسانية وتعمل كحمالات لتثبيت هيكل سقف المبنى.

    لأجل هذا المشروع قضبان التوتر تم توفيرها في الدرجة 700، وهي الأعلى في مجموعتنا. أعلى درجة تسمح بأداء أفضل/نسبة الفولاذ وبالتالي تجعل من الممكن اختيار قطر أصغر. وينتج عن هذا هيكل أرق وجماليات أفضل بشكل عام. علاوة على ذلك، تعمل القضبان ذات القطر والعناصر الأخف أيضًا على تسهيل عمليات المناولة والتركيب في الموقع.

    يتم ربط كل جزء من الشريط بالجزء التالي عن طريق استخدام قارنة التوصيل (بدون تعديل الطول) أو وصلة ربط المقطورة (إمكانية تعديل الطول والشد).

    يتم إجراء التوصيل بالهيكل الخرساني بفضل أطراف الشوكة المثبتة على ألواح مجمعة فولاذية.

    في المجموع، تلك هي أكثر من 129 طنا من قضبان التوتر والتي تثبت هيكل السقف بأوتار يزيد طولها عن 30 مترًا.

    استاد رأس أبو عبود، مكان إقامة كأس العالم لكرة القدم 2022

    استاد رأس أبو عبود، مكان إقامة كأس العالم لكرة القدم 2022

    ملعب رأس أبو عبود هو ملعب كرة قدم قيد الإنشاء في الدوحة، قطر، ويتسع لـ 40 ألف متفرج.

    تم تصميم هذا المشروع خصيصًا لاستيعاب بطولة كأس العالم لكرة القدم في عام 2022: سيكون للملعب تصميم معياري، باستخدام حاويات الشحن المعاد تدويرها، والمقاعد القابلة للإزالة وغيرها من وحدات البناء المعيارية التي سيتم تفكيكها بالكامل وإعادة استخدامها بعد الحدث.

    قامت شركة Dextra بتوريد أكثر من 600 مجموعة من قضبان الشد المصنوعة من الفولاذ الكربوني للتدعيم المتقاطع لهياكل الأسقف والوعاء، بالإضافة إلى السلالم والممرات والمنحدرات. تتراوح قضبان الشد من مقاس سن القضيب M20 (قطر 19 مم) إلى M72 (قطر 70 مم).

    عند اكتماله المتوقع في عام 2020، سيضع استاد رأس أبو عبود معيارًا جديدًا في تصميم البناء المستدام.

    ملعب بيون للكريكيت

    ملعب بيون للكريكيت

    ملعب بيون للكريكيت هو ملعب كريكيت يقع بالقرب من مدينة بيون في ولاية ماهاراشترا بالهند.

    تم تصميم الملعب من قبل شركة هوبكنز للمهندسين المعماريين البريطانية وتم بناؤه في 2010-2011.

    يمكن للملعب استضافة ما يصل إلى 37400 شخص، ويوفر إطلالة رائعة على الجبال المحيطة.

    قامت شركة Dextra بتصميم وتوريد هذا المشروع في عام 2012 قضبان التوتر تعليق سقف المبنى.

    يتم تثبيت أنظمة القضبان المعمارية الطويلة على أبراج فولاذية وتعليق هيكل السقف.

    ال شريط التوتر تم توفير المجموعات من الفولاذ بدرجة 460. ويتكون كل وتر من عدة مقاطع شريطية تم ربطها معًا باستخدام قارنات التوصيل (بدون تعديل الطول) أو شدادات دوارة (إمكانية تعديل الطول والشد).

    في المجموع، أكثر من 50 طنا قضبان التوتر التي تثبت هيكل سقف ملعب بيون للكريكيت.

    مضمار السباق الأولمبي

    مضمار السباق الأولمبي

    The Olympic Velodrome، الذي أعيدت تسميته الآن باسم Lee Valley VeloPark، هو منشأة رياضية متعددة الأغراض تقع في شرق لندن. تم بناء المنشأة في البداية لاستضافة دورة الألعاب الأولمبية والبارالمبية في لندن عام 2012. لا يزال المرفق يتميز بمسارات الطرق ومسارات BMX ويستضيف مسابقات دولية لركوب الدراجات.

    بالنسبة لهذا المشروع، قامت Dextra Europe بتسليم حل Griptec لربط حديد التسليح إلى المقاولين Sir Robert Mcalpine وByrne للإنشاءات.

    تم استخدام وصلات Griptec في الغالب لتوفير وصلات حديد التسليح العمودية في أعمدة مضمار السباق.

    تم دعم حل Griptec الخاص بنا من قبل الموزع المحلي لشركة Dextra في لندن والذي يستضيف معدات Dextra Griptec اللازمة لبثق أكمام Griptec على حديد التسليح.

    Griptec هو حل معتمد من CARES TA1-A وTA1-B وTA1-C، مما يجعله مناسبًا حتى لتطبيقات ربط حديد التسليح الأكثر تقدمًا ومتطلبات المشروع الصارمة.

    الرجاء إدخال المعلومات الخاصة بك

    اتصل بنا

       شارك معلوماتك معنا وسنقوم بالرد عليك في أقرب وقت ممكن.