Penny’s Bay and Kai Tak Community Isolation Facility, Hong Kong

Penny’s Bay and Kai Tak Community Isolation Facility, Hong Kong

Penny’s Bay and Kai Tak Community Isolation Facility (CIF) are quarantine units managed by the Hong Kong government’s Security Bureau (SB) Anti-Epidemic Task Force in response to the surge in COVID-19 cases in 2022.

The quarantine units consist of four-story buildings made of containers, with فورتيك+ couplers used for each module connection. These facilities were designed for temporary use and will be dismantled once the COVID-19 situation improves.

Fortec+ – BD-Approved Mechanical Splicing System

فورتيك+ is a parallel-threaded mechanical splicing system that includes a set of four bar-end preparation machines: cutting, التشكيل البارد, threading, and thread quality testing.

فورتيك+ is an approved system by the Hong Kong Buildings Department (BD), ensuring compliance with local construction standards. Read more about the approval

International Commerce Centre (ICC), Hong Kong

International Commerce Centre (ICC), Hong Kong

The International Commerce Centre (ICC) is a landmark skyscraper in Hong Kong, located in West Kowloon. This commercial building stands 484 meters high and features 108 floors. To this day, it remains the tallest building in Hong Kong and is the 13th tallest building in the world.

Dextra’s Contribution

Vertical reinforcement is a crucial factor for skyscrapers of this height. Consultant ARUP and contractor Sanfield selected Dextra for the splicing of reinforcement throughout the structure. Notably, both stakeholders had previously worked with Dextra on the Two IFC project, another iconic 400m+ skyscraper completed a few years earlier.

For this project, Dextra supplied more than 800,000 فورتك rebar couplers, which were used primarily for vertical connections, especially in columns.

Additionally, rebar couplers provided connection points for second-phase rebar reconnection, typically between:

  • Columns and slabs
  • Columns and beams

In these applications, rebar couplers were aligned horizontally and cast in concrete. The reconnection process was performed later by simply screwing in second-stage rebar.

Preferred Splicing Solution in Hong Kong

فورتك is the preferred reinforcement splicing solution among contractors in Hong Kong, as it is officially recommended in the Hong Kong Building Material List.

Dextra also operates its own rebar threading workshop in Hong Kong, providing rebar preparation services to its customers.

Burj Khalifa, UAE

Burj Khalifa, UAE

With a total height of 829.8 m and a roof height of 828 m, Burj Khalifa is currently the tallest building in the world, holding this record since its topping out in 2009.

Originally named Burj Dubai, the tower was renamed in honor of Khalifa bin Zayed Al Nahyan, the ruler of Abu Dhabi and president of the United Arab Emirates.

This iconic skyscraper quickly became a symbol of Dubai’s ambition to transform into a global tourist hub and gain international recognition.

Structural System

The tower’s structure consists of reinforced concrete construction from the foundation up to Level 156. Above Level 156, the structure transitions into a steel-braced spire. The construction required 330,000 m³ of concrete and 55,000 tons of steel rebar.

The foundation system is a piled raft, consisting of a 3.7 m thick raft supported by 1.5 m diameter bored piles, each extending 50 m below the raft base.

Dextra’s Contribution

Extensive pile load tests were conducted on the tower’s foundation. Additionally, Crosshole Sonic Logging (CSL) testing was performed to ensure the integrity of the concrete foundation, using 20 km of Dextra سونيتيك tubes.

سونيتيك is a fast, simple, and reliable solution for CSL testing, compliant with ASTM D6760, the standard for ultrasonic cross-hole integrity testing.

Moreover, more than 100,000 بارتيك couplers were supplied for the piled-raft extension and reinforcement.

Marina Bay Sands, Singapore

Marina Bay Sands, Singapore

Marina Bay Sands is a spectacular resort featuring more than 2,500 rooms, a casino, numerous restaurants, and a distinctive sky garden. The project was completed and opened to the public in 2010.

Between 2007 and 2008, Dextra supplied بارتيك تعزيز محلول الوصل and Sonitec tubes for the project.

بارتيك rebar couplers were used in the foundations for جدران الحجاب الحاجز, addressing a dual challenge:

  • Vertical connections: Rebar couplers were used to connect D-Wall cages, enabling longer cage lengths.
  • Horizontal connections: couplers were installed on hook bars and cast in concrete as pending connections for slabs. At a later stage, second-phase rebar could be easily connected to initiate slab تعزيز.

Couplers were also used in underground tunnels and the ventilation building.

For the foundations, Dextra supplied over 100,000 linear meters of سونيتيك CSL testing tubes, which are easy to install in تعزيز cages and reconnect. These tubes enhance productivity by eliminating the need for tedious and unreliable welding operations. Once installed, they remain securely in place, ensuring stability during cage lifting and handling.

SOCAR Tower, Azerbaijan

SOCAR Tower, Azerbaijan

برج سوكار is an office tower located on the way to the city center of Baku, the capital of Azerbaijan. It is the tallest building in Azerbaijan and the entire Caucasus region. The building serves as the headquarters of the State Oil Company of Azerbaijan Republic (SOCAR).

The tower features 42 floors and reaches a height of 202 meters. Completed in 2016, it is now one of the most recognizable landmarks in Baku.

For this project, Dextra was involved in the concrete works between 2011 and 2014, supplying the بارتيك rebar coupler solution for all rebar connections. The project was supported by بارتيك bar-end preparation equipment sets, installed directly on-site and maintained by Dextra’s European after-sales team.

Dextra rebar couplers were supplied to contractor Tekfen for:

  • Vertical bar-to-bar connections in columns.
  • Horizontal rebar connections in slabs.
  • Wall-to-beam connections, where the coupler was cast flush with the formwork in the first phase of concreting. After formwork removal, the connecting rebar was simply screwed into the Bartec coupler.

To enable splicing at locations where rebar had not been prepared with a thread, RepairGrip sleeves and hydraulic equipment were also supplied for precise applications. RepairGrip allows for the convenient splicing of rebar where the protruding length is insufficient for a safe overlap.

For more information about the availability of precast solutions in the Middle East, please contact our مكتب دبي.

Gaborone i-Towers, Botswana

Gaborone i-Towers, Botswana

The i-Towers are a three-building mixed-use estate project located in the heart of the new Central Business District of Gaborone, the capital city of Botswana.

The project was designed and built by Murray & Roberts Botswana and features a 21-story residential tower, a 14-story office tower, a commercial building, and parking spaces.

For this new Gaborone landmark, Dextra supplied its بارتيك rebar coupler solutions, the leading rebar splicing solution used in Botswana and South Africa.

بارتيك is often the preferred solution for high-rise projects due to the reliability of its rebar preparation process, its high-performance level, and the productivity gains it offers during reinforcement installation.

In total, more than 20,000 بارتيك rebar couplers were used for columns and slabs in the two i-Towers.

For more information about coupler products and equipment availability in Botswana and South Africa, please contact our مكتب باريس.

Sobha Dream Acres, India

Sobha Dream Acres, India

Sobha Dream Acres is a large residential complex spanning 81 acres, located east of Bangalore, India. This ambitious real estate project features 13 towers of 14 floors, built in record time thanks to the use of precast construction methods, supported by a purpose-built factory equipped with Vollert machinery.

For this project, Dextra provided the owner and contractor, Sobha, with two distinct coupler solutions, supported by threading services.

At Sobha Dream Acres, the جروتيك precast solution was used for the swift connection of precast elements, either to a footing or directly to another precast element. This ensured a high-performance connection and significantly sped up installation compared to traditional wet in-situ joint methods.

After casting on the production line, the panel was transported to its final location for straightening and bracing installation. Locally sourced non-shrink grout was then injected into the cavity. After injection, the bracing around the precast panel could be removed after just three days.

Dextra does not supply the grout, as جروتيك is designed to be compatible with multiple non-shrink grout brands that can be sourced locally, reducing costs and simplifying logistics.

To complement the precast solution, Dextra also supplied its بارتيك حل. بارتيك was used throughout Dream Acres to splice reinforcement for both cast-in-place and precast applications, allowing for extended precast element lengths.

To support both solutions, Dextra India managed the rebar preparation operations. Rebars with بارتيك-threaded ends were delivered directly to Sobha according to their production schedule. The same threaded bars could be used interchangeably with both بارتيك و جروتيك couplers, as both solutions utilize the same threading system.

House of the Earth at Geomatikum, Germany

House of the Earth at Geomatikum, Germany

Adjacent to the Geomatikum building, home to various departments and research centers of the University of Hamburg, the new “House of the Earth” is taking shape. Spanning over 21,000 square meters, this state-of-the-art facility will serve as a hub for geoscience and climate research. Beginning in 2018, all units of the CliSAP (Integrated Climate System Analysis and Prediction) excellence cluster will operate from this location, fostering close collaboration with the Max Planck Institute for Meteorology.

During 2016 and 2017, Dextra supplied its جريبتيك system for the splicing of cast-in-place reinforcement across various sections of the building. جريبتيك couplers, fully approved by DIBt (Deutsches Institut für Bautechnik) for the German construction market, are available throughout Germany via our extensive distributor network.

For more details on جريبتيك availability in Germany, please contact Dextra Europe.

حديقة المدينة، البرازيل

حديقة المدينة، البرازيل

باركي دا سيداد هو مجمع مباني خضراء متعدد الأبراج والأغراض، يقع جنوب ساو باولو. يضم المشروع خمسة أبراج مكاتب، وفندقًا، ومبانٍ سكنية، ومركزًا تجاريًا.

بالنسبة لهذا المشروع، قامت شركة ديكسترا بتزويد رولتيك حل وصلة حديد التسليح للمقاول أودبريشت.

رولتيك هو الحل الأكثر شعبية لربط قضبان التسليح في البرازيل، حيث يوفر بديلاً تنافسيًا لربطات التداخل، والأهم من ذلك، تمكين التطبيقات المتقدمة التي تبسط إدارة المشاريع والعمليات.

في حديقة المدينة، رولتيك استُخدمت وصلات حديد التسليح لربط الأعمدة والعوارض. وقد دعم الحل رولتيك تم تركيب معدات تحضير نهاية الشريط في الموقع وصيانتها من قبل مهندسي دكستريا المحليين.

لهذا التطبيق، تم محاذاة وصلات حديد التسليح أفقيًا ضمن تسليح الأعمدة في كل طابق، ثم صُبّت في الخرسانة. زوّدت شركة دكسترا وصلاتها بأغطية حماية لولبية لمنع تسرب الخرسانة السائلة إلى الوصلات.

في مرحلة لاحقة من المشروع، تم توصيل قضبان الاستمرار مباشرة بالوصلات، مما يوفر قضبان بداية ملائمة لتقوية العوارض أو البلاطة.

بالإضافة إلى ذلك، قامت شركة ديكسترا بتزويد يونيتيك الحل لباركي دا سيداد. يونيتيك وصلة براغي لا تتطلب أي تحضير لقضبان التسليح. استُخدمت لربط قضبان التسليح البارزة من عنصرين مسبقي الصنع.

مبنى خدمة السيارات على طريق كونغ تشونغ، سنغافورة

مبنى خدمة السيارات على طريق كونغ تشونغ، سنغافورة

مبنى خدمة السيارات الكائن في ٢ شارع كونغ تشونغ في سنغافورة هو منشأة متعددة الاستخدامات، مكونة من سبعة طوابق، تضم موقف سيارات في الطابق السفلي، ومركز خدمة سيارات، ومساحات مكتبية. ستشغل المبنى جمعية السيارات في سنغافورة.

هذا المشروع، الذي تم بناؤه بواسطة شركة Zhengda Corporation Pte Ltd، يستخدم مسبقة الصنع التكنولوجيا لتحقيق دورات بناء أسرع. مسبقة الصنع تم إنتاج العناصر بواسطة الماليزيين مسبق الصنع بريتيك الشرقية.

بالنسبة لهذا المشروع، قامت شركة Dextra بتوريد ما يقرب من 6000 جروتيك وصلات إلى مسبق الصنع، والتي تم تضمينها في جدران القص وعناصر العمود.

ال مسبقة الصنع تم بعد ذلك نقل العناصر إلى الموقع وإعادة توصيلها بالأجزاء البارزة تعزيز عن طريق الحقن ملاط الحقن غير القابل للانكماش. التدعيم حول مسبقة الصنع يتم إزالة العناصر عادة خلال ثلاثة أيام من حقن الجص، مما يقلل بشكل كبير من وقت التجميع.