مجموعة دكسترا | اتصالات موثوقة

يبحث
أغلق مربع البحث هذا.
يبحث
أغلق مربع البحث هذا.

Wynn Al Marjan Island, UAE

 

Wynn Al Marjan Island, United Arab Emirates

 

The Wynn Al Marjan Island, located in Ras Al Khaimah, United Arab Emirates, is set to be an iconic luxury destination, marking Wynn’s first foray into the Middle East. This spectacular development will feature a world-class hotel, upscale dining, entertainment venues, and extensive leisure facilities, all nestled along the pristine shores of the Arabian Gulf. With its signature blend of elegance and grandeur, the Wynn aims to offer an unparalleled experience that combines luxury, relaxation, and entertainment for visitors from around the globe.

Dextra has made a substantial contribution to the construction by supplying 350,000 بارتيك couplers. These couplers are essential for the concrete slab and column connections, ensuring robust and reliable reinforcement in both vertical and horizontal applications.

Designed to meet the demanding structural requirements of large-scale developments, بارتيك couplers are known for their superior strength and durability. Their use in the Wynn project not only supports the integrity of the structure but also accelerates construction by facilitating efficient load transfer across critical connection points.

Dextra is proud to be part of this landmark project, demonstrating their commitment to delivering high-quality solutions for premier developments worldwide.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential بارتيك و جروتيك إس systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

 

بارتيك, renowned for its mechanical splicing capabilities, and جروتيك إس, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 

The Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 
 

The Foundation for Public Housing Development at Pik Wan Road stands as a testament to Hong Kong’s commitment to sustainable urban development and infrastructure enhancement. Situated amidst the vibrant cityscape, this construction project embodies a convergence of innovative engineering and community-focused initiatives.

At the heart of this endeavor lies the crucial aspect of slope stabilization—a fundamental requirement in Hong Kong’s hilly terrain, where land development often necessitates meticulous attention to structural integrity. Recognizing the significance of this aspect, the project turned to advanced solutions, seeking to marry effectiveness with environmental responsibility.

Enter دكسترا, a renowned provider of engineering solutions renowned for its commitment to quality and innovation. Dextra’s contribution comprised over a thousand pieces of Glass Fiber Reinforced Polymer (GFRP) Soil Nails — a cutting-edge solution designed to address the specific challenges of slope stabilization. GFRP Soil Nails offer superior corrosion resistance, durability, and ease of installation while minimizing environmental impact.

Dextra’s GFRP solutions have earned the esteemed approval of various authoritative bodies in Hong Kong, including the Buildings Department, a crucial entity overseeing building codes, safety standards, and inspections. Additionally, they have garnered recognition from the Hospital Authority, ensuring their reliability and suitability for healthcare infrastructure. Moreover, recognition from the Housing Department and the Construction Innovation & Technology Fund (CITF) signifies their innovative edge and contribution to advancing construction practices in Hong Kong.

 

Jal Jeevan Mission Water Reservoirs, India

 

Jal Jeevan Mission Water Reservoirs, India

 

The Jal Jeevan Mission of the Government of India is a flagship initiative where attempts are made to ensure adequate supplies of quality drinking water at affordable rates on a long-term basis. It emphasizes the importance of proper water management, infrastructure development, and community participation to achieve the ambitious goal of ‘Har Ghar Jal’ (Water to Every Household).

Considering the widespread geography of India, uneven terrain, and human settlements in remote locations, access to continuous water is a challenge. Therefore, overhead tanks are a good option for efficiently storing and distributing water, particularly in areas with inconsistent water supply patterns. Construction and infrastructure development are yet another key factors that have a direct influence on development.

Precast construction is one such method that has gained tremendous momentum in recent times due to its advantages, such as accelerated productivity, better quality control, environmental friendliness, and optimized material and labor usage. Although this method incurs high initial setup costs, its attractiveness is enhanced by large-scale projects with standardized designs. In the project, our team worked in close coordination with Larsen & Toubro (L&T) from the design stage, carefully selecting Groutec and Bartec couplers to connect the H and U frames of the overhead tanks.

Our range of Groutec couplers is arguably the most reliable mechanical splices, specially designed to connect two precast elements with no requirement for in-situ wet concrete joints. These couplers have been successfully qualified and tested over the years on several major infrastructure projects, including process plant pipe racks, residential and commercial buildings, and data centers, among others.

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec BF couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm Bartec BF couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Indonesia Warehouse

 

Uniqlo & Hive Indonesia Warehouse

 

Indonesia’s building construction has spurred a need for rapid and efficient construction methods capable of meeting the demands of a burgeoning population. Precast construction has emerged as a solution to these challenges as it helps minimize on-site labor requirements, accelerates project timelines, and ensures consistent quality.

At the heart of successful precast construction lies the seamless connection between structural elements. Dextra supplied Groutec precast couplers for projects around the world, including Indonesia. Groutec in size 20mm were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, facilitating rapid and reliable assembly while ensuring structural integrity.

The couplers have minimized on-site labor requirements and accelerated project milestones. This not only translates to cost savings but also ensures timely delivery, allowing the building to fulfill its intended purpose sooner. Additionally, the couplers’ high-strength steel composition and stringent quality control measures guarantee robust connections that withstand the rigors of dynamic structural loads.

 

برج ماهاناخون

برج ماهاناخون

برج MahaNakhon هو ناطحة سحاب مكونة من 77 طابقًا في بانكوك. ويبلغ ارتفاعه 314 مترًا، وأصبح في عام 2016 أطول مبنى في تايلاند. يقع فندق MahaNakhon في Silom، المنطقة التجارية الأكثر ازدحامًا في بانكوك، فوق محطة BTS Skytrain Chong Nonsi مباشرةً. المشروع مملوك للمطور PACE وتم بناؤه بواسطة Bouygues-Thai.

أسس

تمثل المؤسسات دائمًا تحديًا في بانكوك. يتم بناء المدينة على الرمال والتربة الرطبة، ويجب أن تكون الأساسات عميقة وتتميز معظم المشاريع بجدران على شكل حرف D سميكة لمنع تسرب المياه إلى الداخل.

بالنسبة للجدران D في MahaNakhon، قامت Dextra بتزويد قارنات حديد التسليح المستخدمة في الجدران D. تم تركيب القارنات على قضبان خطافية، وتم تركيبها أفقيًا وصبها في الخرسانة. يسمح هذا التطبيق النموذجي بإعادة توصيل القضبان بالجدار D في مرحلة لاحقة عند بدء تقوية البلاطة.

أخيرًا، تم أيضًا تركيب Headed Bars في الأساس السميك غير اللامع. تعد القضبان الرأسية بديلاً مفيدًا للخطافات في المناطق المزدحمة، فهي توفر تثبيتًا عالي الأداء وأسهل في التثبيت.

البنية الفوقية

تم بناء البرج حول جدار أساسي، تم تشييده باستخدام قوالب صب الخرسانة، ويحيط به 12 عمودًا ضخمًا. لتوصيل الأعمدة بالجدار الأساسي، قامت Dextra بتزويد Bouygues-Thai بمنتجها الشهير بارتيك حل. بارتيك تسمح القارنات، التي يتم تركيبها بشكل متسق مع القوالب وصبها في الخرسانة، بإعادة توصيل العبارة الثانية للقضبان لجسر العمود والجدار الأساسي.

في الأعمدة الضخمة، تم أيضًا استخدام قارنات حديد التسليح لإجراء التوصيلات الرأسية من شريط إلى قضيب.

شريط السماء

وأخيرا، قدمت دكسترا أنظمة شريط التوتر في Skybar على السطح. قضبان التوتر يمكن تركيبها بسهولة بأطراف الشوكة الخاصة بها وتوفر نظام تثبيت جمالي.

لمزيد من المعلومات حول حلول Dextra لـ MahaNakhon، تتوفر أيضًا دراسة حالة مع الصور.

mahanakhon_tower_case_study

تحميل الكتيب

برج سيل دبي

برج سيل دبي

برج سيل هو مبنى شاهق مكون من 82 طابقًا قيد الإنشاء في مرسى دبي. وبارتفاع إجمالي يبلغ 365 مترًا، من المقرر أن يصبح المبنى أطول فندق في العالم عند اكتماله المقرر في أواخر عام 2023.

يقع البرج في قلب المارينا، بالقرب من مناطق الجذب الشهيرة مثل ممشى مارينا ومجمع مارينا مول للتسوق والترفيه. وسيضم 1042 جناحًا فاخرًا مع سطح يضم بارًا بجانب المسبح ومطعمًا ومنصة مراقبة.

الهيكل مستوحى بشكل كبير من مفهوم الحياة العمودية، لتحقيق أقصى قدر من الإطلالات على نخلة جميرا، وجزيرة بلو ووترز، وميناء دبي والخليج العربي.

قامت Dextra بتوريد 180,000 قارنة توصيل من Bartec لتوصيل وتعزيز الأطواف والأعمدة بالعوارض والألواح بالجدران الأساسية والجدران الأساسية وقضبان البداية.

يعد برج سيل مشروعًا رائعًا سيصبح معلمًا جديدًا وسيعزز من سمعة دبي كواحدة من الوجهات السياحية الأكثر شعبية في العالم.

مصدر الصور: https://www.archdaily.com/931860/ciel-the-worlds-tallest-hotel-is-under-construction-in-dubai-marina، https://propsearch.ae/dubai/ciel- برج

الرجاء إدخال المعلومات الخاصة بك

اتصل بنا

   شارك معلوماتك معنا وسنقوم بالرد عليك في أقرب وقت ممكن.