Egypt’s record-breaking wastewater treatment facility

The Bahr El Baqar wastewater treatment plant is located in the northern governorate of Port Said, with a daily output capacity of 5.6 million cubic meters. It is a joint venture between the Arab Contractors Company and Orascom Construction.


The plant is the world's largest of its kind, holding three Guinness World Records: the world's largest water treatment facility, processing 64.8 cbm of water per second, largest sludge treatment plant, and largest single-operator ozone generating plant.


Dextra is proud to be a part of this project, supplying Rolltec rebar couplers for the reinforcement of the plant’s concrete structures.


Rolltec is a CARES approved rolled parallel threaded mechanical splicing system designed for the connection of concrete reinforcing bars from Ø12 to 50 mm (ASTM #4 to #18). It offers fast and easy preparation and installation at site.


Source of images: https://www.arabcont.com/english/project-624

Show all projects
  • CountryEgypt
  • Start year2020
  • End year2021
  • ContractorOrascom Construction
  • ConsultantKhatib & Alami
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!

Sign in to your account